Total Energies · EV charging site
Queen's Drive
South east of Seven Sisters Road, Harringay, N4 2AP
Queen's Drive is an EV charging site in Harringay, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 99 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Wilberforce Road (BP Pulse), 120 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 27 Apr 2017)
- Phone (from Open Charge Map)
- 0845 850 0653
- Notes
- One on-street bay
- Getting there
- Charges may apply - refer to the owner of the parking bay for details.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Queen's Drive (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Queen's Drive (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Queen's Drive (Total Energies) have?
2 charging sockets: 2 × 7 kW Type 2, 2 × 4 kW J-1772.
Who operates Queen's Drive?
Queen's Drive is on the Total Energies network. For site issues, the operator lists 0845 850 0653.
Where is the nearest charger with 50 kW or more to Queen's Drive (Total Energies)?
Wilberforce Road (BP Pulse) is 120 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Queen's Drive (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Queen's Drive (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Queen's Drive (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- Wilberforce Road · 50 kW · 120 yd