# Rayners Lane Station · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-rayners-lane-station-uk

Rayners Lane Station is an EV charging site in Pinner, Greater London, run by Total Energies. All 12 of its sockets are 22 kW Type 2.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Alexandra Avenue, HA5 5EG
- **Area:** Pinner, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.57463, -0.37083
- **Getting there:** Height restrictions: 2.08m

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 12 | Not listed |

- **Price:** Free. Parking fees apply. (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Rayners Lane Station (Total Energies)?

The listed price is Free. Parking fees apply.. Prices can change, so check the price at the charger before you start.

### How fast is charging at Rayners Lane Station (Total Energies)?

Up to 22 kW AC via Type 2.

### How many charging sockets does Rayners Lane Station (Total Energies) have?

12 charging sockets: 12 × 22 kW Type 2.

### Who operates Rayners Lane Station?

Rayners Lane Station is on the Total Energies network. For site issues, the operator lists 0845 850 0653.

### How long does a Tesla Model Y Long Range take to charge at Rayners Lane Station (Total Energies)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Rayners Lane Station (Total Energies)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Rayners Lane Station (Total Energies)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Pinner](https://ampmap.co.uk/chargers/united-kingdom/greater-london/pinner)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [477 Alexandra Avenue · Total Energies](https://ampmap.co.uk/charger/total-energies-477-alexandra-avenue-uk) - Type 2 7 kW · 477 Alexandra Avenue
- [2 Quartz Court · Char.gy](https://ampmap.co.uk/charger/char-gy-2-quartz-court-uk) - Type 2 5 kW · 2 Quartz Court
- [80-82 Clitheroe Avenue · Char.gy](https://ampmap.co.uk/charger/char-gy-80-82-clitheroe-avenue-uk) - Type 2 5 kW · 80 - 82 Clitheroe Avenue
- [83-95 Clitheroe Avenue · Char.gy](https://ampmap.co.uk/charger/char-gy-83-95-clitheroe-avenue-uk) - Type 2 5 kW · 83 - 95 Clitheroe Avenue
- [McDonald's Shaftesbury · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-mcdonald-s-shaftesbury-uk) - CCS 63 kW, CHAdeMO 50 kW · 19 Porlock Avenue
- [76-78 Drury Road · Char.gy](https://ampmap.co.uk/charger/char-gy-76-78-drury-road-uk) - Type 2 5 kW · 76 - 78 Drury Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-rayners-lane-station-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 11 Feb 2017).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
