Total Energies · EV charging site
Ruislip Road
11 Ruislip Road Northolt, UB5 6DU
Ruislip Road is an EV charging site in Northolt, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed. 23 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Shell Recharge Shell Budgens Yeading, 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 15 Jun 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Ruislip Road (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Ruislip Road (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Ruislip Road (Total Energies) have?
3 charging sockets: 3 × 7 kW Type 2, 3 × 4 kW J-1772.
Who operates Ruislip Road?
Ruislip Road is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Ruislip Road (Total Energies)?
Shell Recharge Shell Budgens Yeading is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Ruislip Road (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ruislip Road (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Ruislip Road (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 123 Radcliffe Way, Opp Broomcroft Avenue
- ubitricity Distributed Energy Systems UK Ltd. 221 Radcliffe Way
- Wayfarer Road
- Shell Recharge Shell Budgens Yeading
- ubitricity Distributed Energy Systems UK Ltd. 62 Radcliffe Way , o/s Woburn house
- 484-488 Church Rd
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 123 Radcliffe Way, Opp Broomcroft Avenue · 56p per kWh · 5 kW · 0.2 mi
- Fastest nearby
- Shell Recharge Shell Budgens Yeading · 50 kW · 0.2 mi