# Saint John Street 29 · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-saint-john-street-29-uk

Saint John Street 29 is an EV charging site in Islington, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 29 Saint John Street (Site1), EC1M 4AA
- **Area:** Islington, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.52056, -0.10182

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed |
| J-1772 | 4 kW | 2 | Not listed |

- **Price:** £0.059/minute; min £1.18; other tariffs available (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Saint John Street 29 (Total Energies)?

The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.

### How fast is charging at Saint John Street 29 (Total Energies)?

Up to 7 kW AC via Type 2, J-1772.

### How many charging sockets does Saint John Street 29 (Total Energies) have?

2 charging sockets: 2 × 7 kW Type 2, 2 × 4 kW J-1772.

### Who operates Saint John Street 29?

Saint John Street 29 is on the Total Energies network.

### How long does a Tesla Model Y Long Range take to charge at Saint John Street 29 (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Saint John Street 29 (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Saint John Street 29 (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Islington](https://ampmap.co.uk/chargers/united-kingdom/greater-london/islington)
- [Cheapest charging in Islington](https://ampmap.co.uk/chargers/united-kingdom/greater-london/islington/cheapest)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [Cowcross Street · Total Energies](https://ampmap.co.uk/charger/total-energies-cowcross-street-uk) - Type 2 7 kW, J-1772 4 kW · 77 Cowcross Street
- [Smithfield Market Car Park · Total Energies](https://ampmap.co.uk/charger/total-energies-smithfield-market-car-park-uk) - Type 2 7 kW, BS1363 3 Pin 13 Amp 3 kW · West Smithfield
- [Britton Street · Total Energies](https://ampmap.co.uk/charger/total-energies-britton-street-uk) - Type 2 7 kW, J-1772 4 kW · 1 Britton Street
- [West Smithfield Car Park](https://ampmap.co.uk/charger/west-smithfield-car-park-uk) - West Smithfield
- [Pod Point Stephen Grimwood Electrical Ltd](https://ampmap.co.uk/charger/pod-point-stephen-grimwood-electrical-ltd-2-uk) - Type 2 7 kW · 7-21 Goswell Rd. Barbican · From 39.6p/kWh
- [Baynard House Car Park](https://ampmap.co.uk/charger/baynard-house-car-park-uk) - Queen Victoria Street

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-saint-john-street-29-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 8 Jan 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
