Total Energies · EV charging site
Seagrave Road - Site 2
Seagrave Road - Site 2, Fulham, SW6 1SR
Seagrave Road - Site 2 is an EV charging site in Fulham, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 1,401 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Lille Road (Normand Park layby) (ESB Energy), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +44 1732 600 700
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Seagrave Road - Site 2 (Total Energies)?
Up to 7 kW AC via J-1772, Type 2.
How many charging sockets does Seagrave Road - Site 2 (Total Energies) have?
2 charging sockets: 1 × 3 kW J-1772, 1 × 7 kW Type 2.
Who operates Seagrave Road - Site 2?
Seagrave Road - Site 2 is on the Total Energies network. For site issues, the operator lists +44 1732 600 700.
Where is the nearest charger with 50 kW or more to Seagrave Road - Site 2 (Total Energies)?
Lille Road (Normand Park layby) (ESB Energy) is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Seagrave Road - Site 2 (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Seagrave Road - Site 2 (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Seagrave Road - Site 2 (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 69 Seagrave Road, Outside 69
- ubitricity Distributed Energy Systems UK Ltd. 55 Seagrave Road, Outside 55
- Seagrave Road
- ubitricity Distributed Energy Systems UK Ltd. 6 Micklethwaite Road, Outside 6
- Micklethwaite Road
- ubitricity Distributed Energy Systems UK Ltd. Road Seagrave, Outside Flats
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 69 Seagrave Road, Outside 69 · 45p per kWh · 5 kW · 20 yd