Total Energies · EV charging site
Seagrave Road
35 Seagrave Road, Fulham, SW6 1SA
Seagrave Road is an EV charging site at 35 Seagrave Road in Fulham, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. Amp Map lists 4 other charge points named Seagrave Road in Fulham. 1,339 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Lille Road (Normand Park layby) (ESB Energy), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 23 Jul 2018)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Seagrave Road (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Seagrave Road (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Seagrave Road (Total Energies) have?
2 charging sockets: 2 × 7 kW Type 2, 2 × 4 kW J-1772.
Who operates Seagrave Road?
Seagrave Road is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Seagrave Road (Total Energies)?
Lille Road (Normand Park layby) (ESB Energy) is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Seagrave Road (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Seagrave Road (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Seagrave Road (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Seagrave Road
- ubitricity Distributed Energy Systems UK Ltd. 9 Hildyard Road, Outside 9
- ubitricity Distributed Energy Systems UK Ltd. Road Seagrave, Outside Flats
- ubitricity Distributed Energy Systems UK Ltd. 38 Ongar Road, Outside 38
- ubitricity Distributed Energy Systems UK Ltd. 27 Ongar Road, Outside 27
- ubitricity Distributed Energy Systems UK Ltd. 7 Seagrave Road, Outside 7
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 9 Hildyard Road, Outside 9 · 56p per kWh · 5 kW · 70 yd