Total Energies · EV charging site
Shrewsbury Road
Opposite 16 Shrewsbury Road, Notting Hill, W2 5PR
Shrewsbury Road is an EV charging site in Notting Hill, Greater London, run by Total Energies. Its 2 sockets reach up to 22 kW, with Type 2 at the top speed. 1,127 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Westbourne Park Road (ESB Energy), 70 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.073/minute; min £1.38; other tariffs available(from Open Charge Map, 23 Oct 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Shrewsbury Road (Total Energies)?
The listed price is £0.073/minute; min £1.38; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Shrewsbury Road (Total Energies)?
Up to 22 kW AC via J-1772, Type 2.
How many charging sockets does Shrewsbury Road (Total Energies) have?
2 charging sockets: 2 × 4 kW J-1772, 2 × 7 kW Type 2, 2 × 4 kW J-1772, 1 × 22 kW Type 2.
Who operates Shrewsbury Road?
Shrewsbury Road is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Shrewsbury Road (Total Energies)?
Westbourne Park Road (ESB Energy) is 70 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Shrewsbury Road (Total Energies)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Shrewsbury Road (Total Energies)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Shrewsbury Road (Total Energies)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 56 Saint Stephen's Gardens
- Westbourne Park Road
- ubitricity Distributed Energy Systems UK Ltd. 228 Great Western Road, Opp.
- ubitricity Distributed Energy Systems UK Ltd. 50 Saint Stephen's Gardens
- ubitricity Distributed Energy Systems UK Ltd. Great Western Road, Hanwell House
- ubitricity Distributed Energy Systems UK Ltd. 117 Westbourne Park Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 56 Saint Stephen's Gardens · 56p per kWh · 5 kW · 60 yd
- Fastest nearby
- Westbourne Park Road · 50 kW · 70 yd