# Smithfield Market Car Park · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-smithfield-market-car-park-uk

Smithfield Market Car Park is an EV charging site in Islington, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** West Smithfield, EC1A 9DS
- **Area:** Islington, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.51875, -0.10126

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 3 | Not listed |
| BS1363 3 Pin 13 Amp | 3 kW | 3 | Not listed |

- **Price:** Free. Parking fees apply. (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required
- **Notes:** In underground car park

## Common questions

### How much does it cost to charge at Smithfield Market Car Park (Total Energies)?

The listed price is Free. Parking fees apply.. Prices can change, so check the price at the charger before you start.

### How fast is charging at Smithfield Market Car Park (Total Energies)?

Up to 7 kW AC via BS1363 3 Pin 13 Amp, Type 2.

### How many charging sockets does Smithfield Market Car Park (Total Energies) have?

3 charging sockets: 3 × 3 kW BS1363 3 Pin 13 Amp, 3 × 7 kW Type 2.

### Who operates Smithfield Market Car Park?

Smithfield Market Car Park is on the Total Energies network.

### How long does a Tesla Model Y Long Range take to charge at Smithfield Market Car Park (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Smithfield Market Car Park (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Smithfield Market Car Park (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Islington](https://ampmap.co.uk/chargers/united-kingdom/greater-london/islington)
- [Cheapest charging in Islington](https://ampmap.co.uk/chargers/united-kingdom/greater-london/islington/cheapest)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [West Smithfield Car Park](https://ampmap.co.uk/charger/west-smithfield-car-park-uk) - West Smithfield
- [Cowcross Street · Total Energies](https://ampmap.co.uk/charger/total-energies-cowcross-street-uk) - Type 2 7 kW, J-1772 4 kW · 77 Cowcross Street
- [Saint John Street 29 · Total Energies](https://ampmap.co.uk/charger/total-energies-saint-john-street-29-uk) - Type 2 7 kW, J-1772 4 kW · 29 Saint John Street (Site1)
- [Baynard House Car Park](https://ampmap.co.uk/charger/baynard-house-car-park-uk) - Queen Victoria Street
- [NCP Aldersgate · Total Energies](https://ampmap.co.uk/charger/total-energies-ncp-aldersgate-uk) - Type 2 4 kW · 158-170 Aldersgate Street
- [Pod Point Stephen Grimwood Electrical Ltd](https://ampmap.co.uk/charger/pod-point-stephen-grimwood-electrical-ltd-2-uk) - Type 2 7 kW · 7-21 Goswell Rd. Barbican · From 39.6p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-smithfield-market-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 16 Dec 2016).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
