Total Energies · EV charging site
South Croydon Railway Station Car Park
Blunt Road, South Croydon, CR2 7PA
South Croydon Railway Station Car Park is an EV charging site in South Croydon, Greater London, run by Total Energies. All 4 of its sockets are 7 kW Type 2. 25 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Mitchel And Butler (BP Pulse), 1 mile away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free. Parking fees apply.(from Open Charge Map, 22 Nov 2017)
- Notes
- Two Pod-Point Twin charge points
- Getting there
- Unmarked bays so may well be ICEd
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at South Croydon Railway Station Car Park (Total Energies)?
The listed price is Free. Parking fees apply.. Prices can change, so check the price at the charger before you start.
How fast is charging at South Croydon Railway Station Car Park (Total Energies)?
Up to 7 kW AC via Type 2.
How many charging sockets does South Croydon Railway Station Car Park (Total Energies) have?
4 charging sockets: 2 × 7 kW Type 2.
Who operates South Croydon Railway Station Car Park?
South Croydon Railway Station Car Park is on the Total Energies network.
Where is the nearest charger with 50 kW or more to South Croydon Railway Station Car Park (Total Energies)?
Mitchel And Butler (BP Pulse) is 1 mile away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at South Croydon Railway Station Car Park (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at South Croydon Railway Station Car Park (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at South Croydon Railway Station Car Park (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- Birdhurst Rise · 22 kW · 0.1 mi