Total Energies · EV charging site
South End Road
71 South End Road, Kilburn, NW3 2RJ
South End Road is an EV charging site in Kilburn, Greater London, run by Total Energies. It has a single socket, with Type 2 at up to 7 kW. 121 other charging sites are listed within a mile, and the nearest site with 50 kW or more is [E-TAXI ONLY] Rosslyn Hill (BP Pulse), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.073/minute; min £1.38; other tariffs available(from Open Charge Map, 12 May 2019)
- Getting there
- small EV charging bay on west side of South End Road. Supply pillar close to car door.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at South End Road (Total Energies)?
The listed price is £0.073/minute; min £1.38; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at South End Road (Total Energies)?
Up to 7 kW AC via J-1772, Type 2.
How many charging sockets does South End Road (Total Energies) have?
1 charging socket: 1 × 4 kW J-1772, 1 × 7 kW Type 2.
Who operates South End Road?
South End Road is on the Total Energies network.
Where is the nearest charger with 50 kW or more to South End Road (Total Energies)?
[E-TAXI ONLY] Rosslyn Hill (BP Pulse) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at South End Road (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at South End Road (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at South End Road (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- South End Road E
- ubitricity Distributed Energy Systems UK Ltd. 51 Heath Hurst Road
- ubitricity Distributed Energy Systems UK Ltd. 22 Heath Hurst Road
- Hampstead Hill Gardens
- Constantine Road
- [E-TAXI ONLY] Rosslyn Hill
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 51 Heath Hurst Road · 56p per kWh · 5 kW · 150 yd
- Fastest nearby
- [E-TAXI ONLY] Rosslyn Hill · 50 kW · 0.2 mi