Total Energies · EV charging site
South Parade (K&C)
South Parade (K&C), Chelsea, SW3 6LP
South Parade (K&C) is an EV charging site in Chelsea, Greater London, run by Total Energies. Its 3 sockets reach up to 22 kW, with Type 2 at the top speed. 403 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Oakley street (BP Pulse), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at South Parade (K&C) (Total Energies)?
Up to 22 kW AC via Type 2, J-1772.
How many charging sockets does South Parade (K&C) (Total Energies) have?
3 charging sockets: 1 × 22 kW Type 2, 1 × 7 kW Type 2, 1 × 3 kW J-1772.
Who operates South Parade (K&C)?
South Parade (K&C) is on the Total Energies network.
Where is the nearest charger with 50 kW or more to South Parade (K&C) (Total Energies)?
Oakley street (BP Pulse) is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at South Parade (K&C) (Total Energies)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at South Parade (K&C) (Total Energies)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at South Parade (K&C) (Total Energies)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- South Parade Site 2
- ubitricity Distributed Energy Systems UK Ltd. 98 Old Church Street
- ubitricity Distributed Energy Systems UK Ltd. 22 Neville Street
- ubitricity Distributed Energy Systems UK Ltd. 13 Chelsea Square
- ubitricity Distributed Energy Systems UK Ltd. 109 Dovehouse Street
- ubitricity Distributed Energy Systems UK Ltd. 16 Onslow Gardens
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 98 Old Church Street · 56p per kWh · 5 kW · 110 yd