# South Parade · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-south-parade-uk

South Parade is an EV charging site in Chiswick, Greater London, run by Total Energies. Its 2 sockets reach up to 22 kW, with Type 2 at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Opposite 1 South Parade, W4 1LD
- **Area:** Chiswick, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.49606, -0.25609

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 1 | Not listed |
| Type 2 | 7 kW | 2 | Not listed |
| J-1772 | 4 kW | 4 | Not listed |

- **Price:** £0.059/minute; min £1.18; other tariffs available (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at South Parade (Total Energies)?

The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.

### How fast is charging at South Parade (Total Energies)?

Up to 22 kW AC via J-1772, Type 2.

### How many charging sockets does South Parade (Total Energies) have?

2 charging sockets: 2 × 4 kW J-1772, 2 × 7 kW Type 2, 2 × 4 kW J-1772, 1 × 22 kW Type 2.

### Who operates South Parade?

South Parade is on the Total Energies network.

### How long does a Tesla Model Y Long Range take to charge at South Parade (Total Energies)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at South Parade (Total Energies)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at South Parade (Total Energies)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Chiswick](https://ampmap.co.uk/chargers/united-kingdom/greater-london/chiswick)
- [Cheapest charging in Chiswick](https://ampmap.co.uk/chargers/united-kingdom/greater-london/chiswick/cheapest)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [Thornton Avenue · SureCharge](https://ampmap.co.uk/charger/surecharge-thornton-avenue-uk) - Type 2 4 kW · Thornton Avenue
- [ubitricity Distributed Energy Systems UK Ltd. 98 Thornton Avenue, Outside No 98](https://ampmap.co.uk/charger/ubitricity-98-thornton-avenue-outside-no-98-uk) - Ubitricity · Type 2 5 kW · 98 Thornton Avenue, Outside No 98 · From 45p/kWh
- [Flanders Road · SureCharge](https://ampmap.co.uk/charger/surecharge-flanders-road-4-uk) - Type 2 4 kW · Flanders Road
- [ubitricity Distributed Energy Systems UK Ltd. 16 Flanders Road, Outside No 16](https://ampmap.co.uk/charger/ubitricity-16-flanders-road-outside-no-16-uk) - Ubitricity · Type 2 5 kW · 16 Flanders Road, Outside No 16 · From 45p/kWh
- [Mayfield Avenue · SureCharge](https://ampmap.co.uk/charger/surecharge-mayfield-avenue-uk) - Type 2 4 kW · Mayfield Avenue
- [ubitricity Distributed Energy Systems UK Ltd. 33 Mayfield Avenue, Outside 33](https://ampmap.co.uk/charger/ubitricity-33-mayfield-avenue-outside-33-uk) - Ubitricity · Type 2 5 kW · 33 Mayfield Avenue, Outside 33 · From 45p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-south-parade-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 7 Oct 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
