Total Energies · EV charging site
St Charles Square
297 St Charles Square, Notting Hill, W10 6HB
St Charles Square is an EV charging site in Notting Hill, Greater London, run by Total Energies. It has a single socket, with Type 2 at up to 7 kW. 886 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Scrubs Lane Car Park (ESB Energy), 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.073/minute; min £1.38; other tariffs available(from Open Charge Map, 12 May 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at St Charles Square (Total Energies)?
The listed price is £0.073/minute; min £1.38; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at St Charles Square (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does St Charles Square (Total Energies) have?
1 charging socket: 1 × 7 kW Type 2, 1 × 4 kW J-1772.
Who operates St Charles Square?
St Charles Square is on the Total Energies network.
Where is the nearest charger with 50 kW or more to St Charles Square (Total Energies)?
Scrubs Lane Car Park (ESB Energy) is 0.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at St Charles Square (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at St Charles Square (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at St Charles Square (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 297 Saint Charles Square, opp.
- ubitricity Distributed Energy Systems UK Ltd. 264 Ladbroke Grove, opp.
- ubitricity Distributed Energy Systems UK Ltd. 34 Saint Charles Square
- ubitricity Distributed Energy Systems UK Ltd. 375 Portobello Road
- ubitricity Distributed Energy Systems UK Ltd. 222 Ladbroke Grove
- Treverton Street
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 297 Saint Charles Square, opp. · 67p per kWh · 5 kW · 20 yd
- Fastest nearby
- Treverton Street · 22 kW · 0.1 mi