# St Charles Square · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-st-charles-square-uk

St Charles Square is an EV charging site in Notting Hill, Greater London, run by Total Energies. It has a single socket, with Type 2 at up to 7 kW.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 297 St Charles Square, W10 6HB
- **Area:** Notting Hill, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.52224, -0.21307

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 1 | Not listed |
| J-1772 | 4 kW | 1 | Not listed |

- **Price:** £0.073/minute; min £1.38; other tariffs available (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at St Charles Square (Total Energies)?

The listed price is £0.073/minute; min £1.38; other tariffs available. Prices can change, so check the price at the charger before you start.

### How fast is charging at St Charles Square (Total Energies)?

Up to 7 kW AC via Type 2, J-1772.

### How many charging sockets does St Charles Square (Total Energies) have?

1 charging socket: 1 × 7 kW Type 2, 1 × 4 kW J-1772.

### Who operates St Charles Square?

St Charles Square is on the Total Energies network.

### How long does a Tesla Model Y Long Range take to charge at St Charles Square (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at St Charles Square (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at St Charles Square (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Notting Hill](https://ampmap.co.uk/chargers/united-kingdom/greater-london/notting-hill)
- [Cheapest charging in Notting Hill](https://ampmap.co.uk/chargers/united-kingdom/greater-london/notting-hill/cheapest)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [ubitricity Distributed Energy Systems UK Ltd. 297 Saint Charles Square, opp.](https://ampmap.co.uk/charger/ubitricity-297-saint-charles-square-opp-uk) - Ubitricity · Type 2 5 kW · 297 Saint Charles Square, opp. · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 264 Ladbroke Grove, opp.](https://ampmap.co.uk/charger/ubitricity-264-ladbroke-grove-opp-uk) - Ubitricity · Type 2 5 kW · 264 Ladbroke Grove, opp. · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 34 Saint Charles Square](https://ampmap.co.uk/charger/ubitricity-34-saint-charles-square-uk) - Ubitricity · Type 2 5 kW · 34 Saint Charles Square · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 375 Portobello Road](https://ampmap.co.uk/charger/ubitricity-375-portobello-road-uk) - Ubitricity · Type 2 5 kW · 375 Portobello Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 222 Ladbroke Grove](https://ampmap.co.uk/charger/ubitricity-222-ladbroke-grove-uk) - Ubitricity · Type 2 5 kW · 222 Ladbroke Grove · From 45p/kWh
- [Treverton Street · Total Energies](https://ampmap.co.uk/charger/total-energies-treverton-street-uk) - Type 2 22 kW · 4 Treverton Street

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-st-charles-square-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 12 May 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
