Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Total Energies · EV charging site

Staveley Gardens

Staveley Gardens, Barnes, W4 2RZ

Staveley Gardens is an EV charging site in Barnes, Greater London (W4 2RZ), run by Total Energies. All 3 of its sockets are 7 kW Type 2. Amp Map lists 1 other charge point named Staveley Gardens in Barnes. 238 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Outside 5-13 Grantham Road (BP Pulse), 0.3 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 8 Sept 2020Last verified 8 Sept 2020

Connectors

Type 2 · 7 kW3 connectors

Site information

Opening hours
Not published
Access
Public · membership required · access key required

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Staveley Gardens (Total Energies)?

Up to 7 kW AC via Type 2.

How many charging sockets does Staveley Gardens (Total Energies) have?

3 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2, 1 × 7 kW Type 2.

Who operates Staveley Gardens?

Staveley Gardens is on the Total Energies network.

Where is the nearest charger with 50 kW or more to Staveley Gardens (Total Energies)?

Outside 5-13 Grantham Road (BP Pulse) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Staveley Gardens (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Staveley Gardens (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Staveley Gardens (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 8 Sept 2020

Amp Map does not take payment. You pay the operator.