Total Energies · EV charging site
Strand on Green
Strand on Green, Chiswick, W4 3NQ
Strand on Green is an EV charging site in Chiswick, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed. 168 other charging sites are listed within a mile, and the nearest site with 50 kW or more is M4, Chiswick Flyover (BP Pulse), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 15 Aug 2017)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Strand on Green (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Strand on Green (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Strand on Green (Total Energies) have?
3 charging sockets: 3 × 7 kW Type 2, 3 × 4 kW J-1772.
Who operates Strand on Green?
Strand on Green is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Strand on Green (Total Energies)?
M4, Chiswick Flyover (BP Pulse) is 0.4 miles away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Strand on Green (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Strand on Green (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Strand on Green (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 4 Waldeck Road, Outside No 4
- ubitricity Distributed Energy Systems UK Ltd. 9 Waldeck Road, Outside No 9
- Waldeck Road
- ubitricity Distributed Energy Systems UK Ltd. 40 Waldeck Road, Opposite No. 40
- Pyrmont Road
- ubitricity Distributed Energy Systems UK Ltd. 40 Pyrmont Road, Outside No. 40
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 4 Waldeck Road, Outside No 4 · 56p per kWh · 5 kW · 170 yd