Total Energies · EV charging site
Sussex Place
Sussex Place With Clifton Place Junction, Bayswater, W2 2SQ
Sussex Place is an EV charging site in Bayswater, Greater London, run by Total Energies. It has a single 22 kW Type 2 socket. 706 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Brook Street, Hyde Park Estate, Westminster (ESB Energy), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.073/minute; min £1.38; other tariffs available(from Open Charge Map, 7 Oct 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Sussex Place (Total Energies)?
The listed price is £0.073/minute; min £1.38; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Sussex Place (Total Energies)?
Up to 22 kW AC via Type 2.
How many charging sockets does Sussex Place (Total Energies) have?
1 charging socket: 1 × 22 kW Type 2.
Who operates Sussex Place?
Sussex Place is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Sussex Place (Total Energies)?
Brook Street, Hyde Park Estate, Westminster (ESB Energy) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Sussex Place (Total Energies)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Sussex Place (Total Energies)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Sussex Place (Total Energies)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 3 Sussex Place
- ubitricity Distributed Energy Systems UK Ltd. Sussex Place, side of Radnor Lodge.
- ubitricity Distributed Energy Systems UK Ltd. 20 Gloucester Square
- ubitricity Distributed Energy Systems UK Ltd. 2 Sussex Place
- ubitricity Distributed Energy Systems UK Ltd. 9 Gloucester Square
- ubitricity Distributed Energy Systems UK Ltd. 50 Gloucester Square
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 3 Sussex Place · 45p per kWh · 5 kW · 20 yd