Total Energies · EV charging site
Sutherland Grove
129 Sutherland Grove, Putney, SW18 1PL
Sutherland Grove is an EV charging site at 129 Sutherland Grove in Putney, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed. Amp Map lists 1 other charge point named Sutherland Grove in Putney. 154 other charging sites are listed within a mile, and the nearest site with 50 kW or more is MFG Power Putney (MFG EV Power), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 4 Jan 2018)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Sutherland Grove (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Sutherland Grove (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Sutherland Grove (Total Energies) have?
3 charging sockets: 3 × 7 kW Type 2, 3 × 4 kW J-1772.
Who operates Sutherland Grove?
Sutherland Grove is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Sutherland Grove (Total Energies)?
MFG Power Putney (MFG EV Power) is 0.2 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Sutherland Grove (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Sutherland Grove (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Sutherland Grove (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Sutherland Grove
- ubitricity Distributed Energy Systems UK Ltd. 164 Sutherland Grove, opp.
- ubitricity Distributed Energy Systems UK Ltd. 25 Arnal Crescent
- MFG Power Putney
- ubitricity Distributed Energy Systems UK Ltd. 19 Linstead Way , Opp.
- ubitricity Distributed Energy Systems UK Ltd. 98 Sutherland Grove
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 164 Sutherland Grove, opp. · 45p per kWh · 5 kW · 80 yd
- Fastest nearby
- MFG Power Putney · 150 kW · 0.2 mi