Total Energies · EV charging site
Talbot Road
Talbot Road east of Portobello Road, Notting Hill, W11 2DT
Talbot Road is an EV charging site in Notting Hill, Greater London, run by Total Energies. It has a single socket, with Type 2 at up to 7 kW. 925 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Westbourne Park Road (ESB Energy), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.073/minute; min £1.38; other tariffs available(from Open Charge Map, 12 May 2019)
- Phone (from Open Charge Map)
- 0845 850 0653
- Notes
- IER model charge point
- Getting there
- Charges may apply - refer to the owner of the parking bay for details.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Talbot Road (Total Energies)?
The listed price is £0.073/minute; min £1.38; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Talbot Road (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Talbot Road (Total Energies) have?
1 charging socket: 1 × 7 kW Type 2, 1 × 4 kW J-1772.
Who operates Talbot Road?
Talbot Road is on the Total Energies network. For site issues, the operator lists 0845 850 0653.
Where is the nearest charger with 50 kW or more to Talbot Road (Total Energies)?
Westbourne Park Road (ESB Energy) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Talbot Road (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Talbot Road (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Talbot Road (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 14 Clydesdale Road, opp church
- ubitricity Distributed Energy Systems UK Ltd. 254 Westbourne Park Road
- ubitricity Distributed Energy Systems UK Ltd. 269 Westbourne Park Road
- ubitricity Distributed Energy Systems UK Ltd. 115 Basing Street
- ubitricity Distributed Energy Systems UK Ltd. 25 Powis Square, opp.
- ubitricity Distributed Energy Systems UK Ltd. 19 Colville Terrace
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 14 Clydesdale Road, opp church · 56p per kWh · 5 kW · 90 yd