Total Energies · EV charging site
Templewood Avenue
14 Templewood Avenue, Kilburn, NW3 7UY
Templewood Avenue is an EV charging site in Kilburn, Greater London, run by Total Energies. It has a single socket, with Type 2 at up to 7 kW. 91 other charging sites are listed within a mile, and the nearest site with 50 kW or more is [E-TAXI ONLY] Rosslyn Hill (BP Pulse), 0.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.073/minute; min £1.38; other tariffs available(from Open Charge Map, 30 May 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Templewood Avenue (Total Energies)?
The listed price is £0.073/minute; min £1.38; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Templewood Avenue (Total Energies)?
Up to 7 kW AC via J-1772, Type 2.
How many charging sockets does Templewood Avenue (Total Energies) have?
1 charging socket: 1 × 4 kW J-1772, 1 × 7 kW Type 2.
Who operates Templewood Avenue?
Templewood Avenue is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Templewood Avenue (Total Energies)?
[E-TAXI ONLY] Rosslyn Hill (BP Pulse) is 0.9 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Templewood Avenue (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Templewood Avenue (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Templewood Avenue (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Templewood Gardens
- Rosecroft Avenue
- ubitricity Distributed Energy Systems UK Ltd. 36 Hollycroft Avenue
- ubitricity Distributed Energy Systems UK Ltd. 39 Redington Road, opp.
- Ferncroft Avenue
- ubitricity Distributed Energy Systems UK Ltd. 4 Hollycroft Avenue
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 36 Hollycroft Avenue · 56p per kWh · 5 kW · 0.2 mi
- Fastest nearby
- Templewood Gardens · 22 kW · 0.1 mi