# Tennyson Road · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-tennyson-road-uk

Tennyson Road is an EV charging site in Kilburn, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Tennyson Road, NW6 7RT
- **Area:** Kilburn, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.54053, -0.20349

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 1 | Not listed |
| J-1772 | 3 kW | 1 | Not listed |

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How fast is charging at Tennyson Road (Total Energies)?

Up to 7 kW AC via J-1772, Type 2.

### How many charging sockets does Tennyson Road (Total Energies) have?

2 charging sockets: 1 × 3 kW J-1772, 1 × 7 kW Type 2.

### Who operates Tennyson Road?

Tennyson Road is on the Total Energies network.

### How long does a Tesla Model Y Long Range take to charge at Tennyson Road (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Tennyson Road (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Tennyson Road (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Kilburn](https://ampmap.co.uk/chargers/united-kingdom/greater-london/kilburn)
- [Cheapest charging in Kilburn](https://ampmap.co.uk/chargers/united-kingdom/greater-london/kilburn/cheapest)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [ubitricity Distributed Energy Systems UK Ltd. 102 - 130 Willesden Lane](https://ampmap.co.uk/charger/ubitricity-102-130-willesden-lane-uk) - Ubitricity · Type 2 5 kW · 102 - 130 Willesden Lane · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 5 Tennyson Road](https://ampmap.co.uk/charger/ubitricity-5-tennyson-road-uk) - Ubitricity · Type 2 5 kW · 5 Tennyson Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 5 Torbay Road](https://ampmap.co.uk/charger/ubitricity-5-torbay-road-uk) - Ubitricity · Type 2 5 kW · 5 Torbay Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 4 Kingsley Road](https://ampmap.co.uk/charger/ubitricity-4-kingsley-road-uk) - Ubitricity · Type 2 5 kW · 4 Kingsley Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 11A Kingsley Road](https://ampmap.co.uk/charger/ubitricity-11a-kingsley-road-uk) - Ubitricity · Type 2 5 kW · 11A Kingsley Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 26 Kingsley Road](https://ampmap.co.uk/charger/ubitricity-26-kingsley-road-uk) - Ubitricity · Type 2 5 kW · 26 Kingsley Road · From 45p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-tennyson-road-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 8 Mar 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
