Total Energies · EV charging site
The Green
26 the Green, Hounslow, TW2 5AB
The Green is an EV charging site in Hounslow, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 129 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Shell Recharge Shell Oak Lane, 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 1 Apr 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at The Green (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at The Green (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does The Green (Total Energies) have?
2 charging sockets: 2 × 7 kW Type 2, 2 × 4 kW J-1772, 2 × 7 kW Type 2.
Who operates The Green?
The Green is on the Total Energies network.
Where is the nearest charger with 50 kW or more to The Green (Total Energies)?
Shell Recharge Shell Oak Lane is 0.7 miles away in a straight line, with up to 180 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Green (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Green (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Green (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 1 Norcutt Road, Twickenham
- ubitricity Distributed Energy Systems UK Ltd. 36 May Road
- ubitricity Distributed Energy Systems UK Ltd. 66 Hamilton Road
- ubitricity Distributed Energy Systems UK Ltd. 60 Hamilton Road
- ubitricity Distributed Energy Systems UK Ltd. 31 Norcutt Road, Twickenham
- ubitricity Distributed Energy Systems UK Ltd. 2 Gravel Road, Junc. May Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 1 Norcutt Road, Twickenham · 67p per kWh · 5 kW · 0.1 mi