Total Energies · EV charging site
Tring Avenue
3 Tring Avenue, Ealing Common, W5 3QA
Tring Avenue is an EV charging site in Ealing Common, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed. 67 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Doubletree Hilton Ealing (BP Pulse), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 8 Jun 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Tring Avenue (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Tring Avenue (Total Energies)?
Up to 7 kW AC via J-1772, Type 2.
How many charging sockets does Tring Avenue (Total Energies) have?
3 charging sockets: 3 × 4 kW J-1772, 3 × 7 kW Type 2, 3 × 4 kW J-1772, 3 × 7 kW Type 2, 3 × 4 kW J-1772.
Who operates Tring Avenue?
Tring Avenue is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Tring Avenue (Total Energies)?
Doubletree Hilton Ealing (BP Pulse) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Tring Avenue (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Tring Avenue (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Tring Avenue (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fordhook Avenue
- Crosslands Avenue
- Doubletree Hilton Ealing
- Creffield Road
- ubitricity Distributed Energy Systems UK Ltd. 26A Woodgrange Avenue
- ubitricity Distributed Energy Systems UK Ltd. 1 Elm Avenue
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 26A Woodgrange Avenue · 56p per kWh · 5 kW · 0.2 mi
- Fastest nearby
- Doubletree Hilton Ealing · 50 kW · 0.1 mi