Total Energies · EV charging site
Turner Street
65 Turner Street, Shadwell, E1 2AB
Turner Street is an EV charging site in Shadwell, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 703 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Shell Recharge Shell Whitechapel, 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 1 Apr 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Turner Street (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Turner Street (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Turner Street (Total Energies) have?
2 charging sockets: 2 × 7 kW Type 2, 2 × 4 kW J-1772, 2 × 7 kW Type 2, 2 × 4 kW J-1772.
Who operates Turner Street?
Turner Street is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Turner Street (Total Energies)?
Shell Recharge Shell Whitechapel is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Turner Street (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Turner Street (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Turner Street (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. Turner Street Opposite Ashfield Street, Turne
- ubitricity Distributed Energy Systems UK Ltd. 20 Ashfield Street, Ashfield Street
- ubitricity Distributed Energy Systems UK Ltd. 65 Turner Street, Blizard Building, Turner St
- ubitricity Distributed Energy Systems UK Ltd. Newark Street East Junc. Turner Street, Newa
- ubitricity Distributed Energy Systems UK Ltd. 36 Newark Street, Newark Street
- ubitricity Distributed Energy Systems UK Ltd. 36 Turner Street, Turner Street
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. Turner Street Opposite Ashfield Street, Turne · 55p per kWh · 5 kW · 10 yd