Total Energies · EV charging site
Upney Lane
25 Upney Lane, Barking, IG11 9LA
Upney Lane is an EV charging site in Barking, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed. 21 other charging sites are listed within a mile, and the nearest site with 50 kW or more is MFG Loxford (MFG EV Power), 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 15 Mar 2018)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Upney Lane (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Upney Lane (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Upney Lane (Total Energies) have?
3 charging sockets: 3 × 7 kW Type 2, 3 × 4 kW J-1772.
Who operates Upney Lane?
Upney Lane is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Upney Lane (Total Energies)?
MFG Loxford (MFG EV Power) is 0.7 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Upney Lane (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Upney Lane (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Upney Lane (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- The Drive
- ubitricity Distributed Energy Systems UK Ltd. Medway close outside flats
- ubitricity Distributed Energy Systems UK Ltd. Mortlake road 188
- ubitricity Distributed Energy Systems UK Ltd. 41 Littlemoor Road opp., Junc. 417A Hampton R
- ubitricity Distributed Energy Systems UK Ltd. 138 Mortlake road
- MFG Loxford
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. Medway close outside flats · 56p per kWh · 5 kW · 0.6 mi
- Fastest nearby
- MFG Loxford · 150 kW · 0.7 mi