Total Energies · EV charging site
Upton Gardens
4 Upton Gardens, Harrow, HA3 0DL
Upton Gardens is an EV charging site in Harrow, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 10 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Harrow-On-The-Hill LU Station Car Park, Station Approach, Harrow (ESB Energy), 1 mile away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 1 Apr 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Upton Gardens (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Upton Gardens (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Upton Gardens (Total Energies) have?
2 charging sockets: 2 × 7 kW Type 2, 2 × 4 kW J-1772.
Who operates Upton Gardens?
Upton Gardens is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Upton Gardens (Total Energies)?
Harrow-On-The-Hill LU Station Car Park, Station Approach, Harrow (ESB Energy) is 1 mile away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Upton Gardens (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Upton Gardens (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Upton Gardens (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Northwick Park Hospital
- ubitricity Distributed Energy Systems UK Ltd. 87 Vista Way
- Pod Point London Northwest University Healthcare Northwick Park Hospital
- Greenhill Way
- Lyon Road
- ubitricity Distributed Energy Systems UK Ltd. 7 Vista Way
- Cheapest nearby
- Pod Point London Northwest University Healthcare Northwick Park Hospital · 45.6p per kWh · 7 kW · 0.7 mi
- Fastest nearby
- Lyon Road · 22 kW · 0.9 mi