# Victoria Villas · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-victoria-villas-uk

Victoria Villas is an EV charging site in Richmond, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Victoria Villas, TW9 2JX
- **Area:** Richmond, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.46607, -0.29148

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 6 | Not listed |
| J-1772 | 4 kW | 9 | Not listed |

- **Price:** £0.059/minute; min £1.18; other tariffs available (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Victoria Villas (Total Energies)?

The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.

### How fast is charging at Victoria Villas (Total Energies)?

Up to 7 kW AC via J-1772, Type 2.

### How many charging sockets does Victoria Villas (Total Energies) have?

3 charging sockets: 3 × 4 kW J-1772, 3 × 7 kW Type 2, 3 × 4 kW J-1772, 3 × 7 kW Type 2, 3 × 4 kW J-1772.

### Who operates Victoria Villas?

Victoria Villas is on the Total Energies network.

### How long does a Tesla Model Y Long Range take to charge at Victoria Villas (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Victoria Villas (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Victoria Villas (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Richmond](https://ampmap.co.uk/chargers/united-kingdom/greater-london/richmond)
- [Cheapest charging in Richmond](https://ampmap.co.uk/chargers/united-kingdom/greater-london/richmond/cheapest)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [ubitricity Distributed Energy Systems UK Ltd. 11 Raleigh Road](https://ampmap.co.uk/charger/ubitricity-11-raleigh-road-uk) - Ubitricity · Type 2 5 kW · 11 Raleigh Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. Castlegate s/o 8 St Pauls Road](https://ampmap.co.uk/charger/ubitricity-castlegate-s-o-8-st-pauls-road-uk) - Ubitricity · Type 2 5 kW · Castlegate s/o 8 St Pauls Road · From 44p/kWh
- [Ultra Rapid EV Charging - Sainsbury's Richmond · Smart Charge by Sainsbury's](https://ampmap.co.uk/charger/smart-charge-by-sainsbury-s-ultra-rapid-ev-charging-sainsbury-s-richmond-uk) - CCS 150 kW, CHAdeMO 50 kW · Sainsbury's
- [ubitricity Distributed Energy Systems UK Ltd. 15 Cedar Terrace](https://ampmap.co.uk/charger/ubitricity-15-cedar-terrace-uk) - Ubitricity · Type 2 5 kW · 15 Cedar Terrace · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 7 Cedar Terrace](https://ampmap.co.uk/charger/ubitricity-7-cedar-terrace-uk) - Ubitricity · Type 2 5 kW · 7 Cedar Terrace · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 46 Raleigh Road](https://ampmap.co.uk/charger/ubitricity-46-raleigh-road-uk) - Ubitricity · Type 2 5 kW · 46 Raleigh Road · From 45p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-victoria-villas-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 1 Apr 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
