# Waldeck Road 75 · Total Energies

Web page: https://ampmap.co.uk/charger/total-energies-waldeck-road-75-uk

Waldeck Road 75 is an EV charging site in Harringay, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 75 Waldeck Road, N15 3EL
- **Area:** Harringay, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.58981, -0.09715
- **Getting there:** Two on-street charging bays. Max stay 4 hours.

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 4 | Not listed |
| J-1772 | 4 kW | 2 | Not listed |

- **Price:** £0.059/minute; min £1.18; other tariffs available (from Open Charge Map)

## Site information

- **Operator:** Total Energies
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required
- **Notes:** Pod-Point model PP\_2151 charge point.

## Common questions

### How much does it cost to charge at Waldeck Road 75 (Total Energies)?

The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.

### How fast is charging at Waldeck Road 75 (Total Energies)?

Up to 7 kW AC via Type 2, J-1772.

### How many charging sockets does Waldeck Road 75 (Total Energies) have?

2 charging sockets: 2 × 7 kW Type 2, 2 × 4 kW J-1772, 2 × 7 kW Type 2.

### Who operates Waldeck Road 75?

Waldeck Road 75 is on the Total Energies network.

### How long does a Tesla Model Y Long Range take to charge at Waldeck Road 75 (Total Energies)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Waldeck Road 75 (Total Energies)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Waldeck Road 75 (Total Energies)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Harringay](https://ampmap.co.uk/chargers/united-kingdom/greater-london/harringay)
- [Total Energies chargers](https://ampmap.co.uk/networks/total-energies)

## Chargers near this site

- [West Green Road 526 · Total Energies](https://ampmap.co.uk/charger/total-energies-west-green-road-526-uk) - Type 2 7 kW, J-1772 4 kW · Opposite 526 West Green Road
- [Downhills Park Road · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-downhills-park-road-uk) - Type 2 7 kW · Downhills Park Road, West Green · From 65p/kWh
- [High Road Wood Green 20 · Total Energies](https://ampmap.co.uk/charger/total-energies-high-road-wood-green-20-uk) - Type 2 22 kW · 20 High Road Wood Green
- [ubitricity Distributed Energy Systems UK Ltd. 140 Russell Avenue](https://ampmap.co.uk/charger/ubitricity-140-russell-avenue-uk) - Ubitricity · Type 2 5 kW · 140 Russell Avenue · From 45p/kWh
- [Bury Road Car Park · Total Energies](https://ampmap.co.uk/charger/total-energies-bury-road-car-park-uk) - BS1363 3 Pin 13 Amp 3 kW · Bury Road
- [Mark Road · Total Energies](https://ampmap.co.uk/charger/total-energies-mark-road-uk) - Type 2 22 kW · 75 Mark Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/total-energies-waldeck-road-75-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 1 Apr 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
