Total Energies · EV charging site
Watermeadow Lane
Watermeadow Lane, Latchmere, SW6 2RW
Watermeadow Lane is an EV charging site in Latchmere, Greater London (SW6 2RW), run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed. Amp Map lists 1 other charge point named Watermeadow Lane in Latchmere. 630 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Sainsburys Fulham Wharf (Smart Charge by Sainsbury's), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 27 Apr 2017)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Watermeadow Lane (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Watermeadow Lane (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Watermeadow Lane (Total Energies) have?
3 charging sockets: 3 × 7 kW Type 2, 3 × 4 kW J-1772.
Who operates Watermeadow Lane?
Watermeadow Lane is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Watermeadow Lane (Total Energies)?
Sainsburys Fulham Wharf (Smart Charge by Sainsbury's) is 0.2 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Watermeadow Lane (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Watermeadow Lane (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Watermeadow Lane (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Townmead Road
- ubitricity Distributed Energy Systems UK Ltd. 136 Townmead Road, Outside136
- Watermeadow Lane
- ubitricity Distributed Energy Systems UK Ltd. 35 Byam Street
- ubitricity Distributed Energy Systems UK Ltd. 16 Querrin Street, Outside 16
- ubitricity Distributed Energy Systems UK Ltd. 4A Querrin Street, Outside 4A
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 136 Townmead Road, Outside136 · 56p per kWh · 5 kW · 60 yd