Total Energies · EV charging site
West Barnes Lane
365 West Barnes Lane, Worcester Park, KT3 6JF
West Barnes Lane is an EV charging site in Worcester Park, Greater London, run by Total Energies. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 89 other charging sites are listed within a mile, and the nearest site with 50 kW or more is MFG Malden Way (MFG EV Power), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 9 Jun 2017)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at West Barnes Lane (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at West Barnes Lane (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does West Barnes Lane (Total Energies) have?
2 charging sockets: 2 × 7 kW Type 2, 2 × 4 kW J-1772.
Who operates West Barnes Lane?
West Barnes Lane is on the Total Energies network.
Where is the nearest charger with 50 kW or more to West Barnes Lane (Total Energies)?
MFG Malden Way (MFG EV Power) is 0.4 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at West Barnes Lane (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at West Barnes Lane (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at West Barnes Lane (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- 107 Consfield Avenue
- 37 Marina Drive
- ubitricity Distributed Energy Systems UK Ltd. Avenue Phyliss, Junction With Seaforth Avenue
- ubitricity Distributed Energy Systems UK Ltd. Avenue Tennyson, Junction With Arthur Road
- 423 West Barns Lane
- 72 Belmont Avenue
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. Avenue Phyliss, Junction With Seaforth Avenue · 45p per kWh · 5 kW · 0.1 mi