Total Energies · EV charging site
Western Road
Western Road, Southall, UB2 5HH
Western Road is an EV charging site in Southall, Greater London, run by Total Energies. Both of its sockets are 7 kW Type 2. 26 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Heston, UK - Eastbound (Tesla), 0.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Western Road (Total Energies)?
Up to 7 kW AC via Type 2.
How many charging sockets does Western Road (Total Energies) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Western Road?
Western Road is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Western Road (Total Energies)?
Heston, UK - Eastbound (Tesla) is 0.8 miles away in a straight line, with up to 250 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Western Road (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Western Road (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Western Road (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 105 Featherstone Road
- ubitricity Distributed Energy Systems UK Ltd. 83 Featherstone Road
- Leonard Road
- Dudley Road
- Spencer Street
- Havelock Rd
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 105 Featherstone Road · 56p per kWh · 5 kW · 160 yd
- Fastest nearby
- Leonard Road · 22 kW · 0.1 mi