Total Energies · EV charging site
Wide Way
52 Wide Way Mitcham, Norbury, CR4 1BL
Wide Way is an EV charging site at 52 Wide Way Mitcham in Norbury, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed. Amp Map lists 1 other charge point named Wide Way in Norbury. 91 other charging sites are listed within a mile, and the nearest site with 50 kW or more is London Road Croydon, 0.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 1 Apr 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Wide Way (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Wide Way (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Wide Way (Total Energies) have?
3 charging sockets: 3 × 7 kW Type 2, 3 × 4 kW J-1772, 3 × 7 kW Type 2, 3 × 4 kW J-1772, 3 × 7 kW Type 2.
Who operates Wide Way?
Wide Way is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Wide Way (Total Energies)?
London Road Croydon is 0.9 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Wide Way (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Wide Way (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Wide Way (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. Road Avenue, Junction With Northborough Road
- 39 Ivy Gardens
- ubitricity Distributed Energy Systems UK Ltd. Road Beckway, Junction With Northborough Road
- 191 Manor Way
- Holly Road
- 328 Northborough Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. Road Avenue, Junction With Northborough Road · 56p per kWh · 5 kW · 0.1 mi