Total Energies · EV charging site
Woodside
72 Woodside, Wimbledon, SW19 7QL
Woodside is an EV charging site in Wimbledon, Greater London, run by Total Energies. Its 3 sockets reach up to 7 kW, with Type 2 at the top speed. 295 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Shell Recharge EV Waitrose - Wimbledon, 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Total Energies
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.059/minute; min £1.18; other tariffs available(from Open Charge Map, 8 Jan 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Woodside (Total Energies)?
The listed price is £0.059/minute; min £1.18; other tariffs available. Prices can change, so check the price at the charger before you start.
How fast is charging at Woodside (Total Energies)?
Up to 7 kW AC via Type 2, J-1772.
How many charging sockets does Woodside (Total Energies) have?
3 charging sockets: 3 × 7 kW Type 2, 3 × 4 kW J-1772.
Who operates Woodside?
Woodside is on the Total Energies network.
Where is the nearest charger with 50 kW or more to Woodside (Total Energies)?
Shell Recharge EV Waitrose - Wimbledon is 0.4 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Woodside (Total Energies)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Woodside (Total Energies)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Woodside (Total Energies)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 56 Alwyne Road, Opposite 56
- ubitricity Distributed Energy Systems UK Ltd. 7 Compton Road, Outside 7
- ubitricity Distributed Energy Systems UK Ltd. Road Lake, Opposite Lake Close
- Opposite 49 Woodside
- 51 Compton Road
- ubitricity Distributed Energy Systems UK Ltd. Drive Belvedere, Outside Harrowdene Court
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 56 Alwyne Road, Opposite 56 · 67p per kWh · 5 kW · 110 yd