# Trenderway Farm

Web page: https://ampmap.co.uk/charger/trenderway-farm-uk

Trenderway Farm is an EV charging site in St Austell, Cornwall, run by Trenderway Farm and open 24 hours a day. All 4 of its sockets are 22 kW Type 2. Recorded live status shows it is usually busiest around 8 am, and Amp Map measured 100% uptime and recorded 10 charging sessions here over the last 30 days.

## Status

4 of 4 open at 22 Nov 2026, 13:30 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Trender Way Farm, PL13 2LY
- **Area:** St Austell, Cornwall, United Kingdom
- **Coordinates (latitude, longitude):** 50.35235, -4.51223
- **Parking:** Car park
- **Getting there:** Residents have priority for this Charge Point located on the gravel car park Down drive to left of gravel car park you will find two more charge points for non residents.

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 22 kW | 4 | Not listed | 4 free |

## Site information

- **Operator:** Trenderway Farm
- **Opening hours:** Open 24 hours
- **Payment:** In the operator's app; RFID card

## Common questions

### How fast is charging at Trenderway Farm?

Up to 22 kW AC via Type 2.

### How many charging sockets does Trenderway Farm have?

4 charging sockets: 4 × 22 kW Type 2. Live per-socket availability is shown on this page.

### Is Trenderway Farm open 24/7?

Yes - Trenderway Farm is open 24 hours a day, 7 days a week.

### When is Trenderway Farm busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 8 am and quietest around 2 pm. The live status on this page shows what is free before you set off.

### How reliable is Trenderway Farm?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 10 observed charging sessions.

### Who operates Trenderway Farm?

Trenderway Farm is on the Trenderway Farm network.

### How long does a Tesla Model Y Long Range take to charge at Trenderway Farm?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Trenderway Farm?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Trenderway Farm?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in St Austell](https://ampmap.co.uk/chargers/united-kingdom/cornwall/st-austell)

## Chargers near this site

- [Trenderway Farm B&B and Wedding Venue · Monta](https://ampmap.co.uk/charger/monta-trenderway-farm-b-and-b-and-wedding-venue-uk) - CCS 22 kW, NACS 22 kW · Trenderway Farm
- [Pod Point Seaview Holiday Village](https://ampmap.co.uk/charger/pod-point-seaview-holiday-village-uk) - Type 2 7 kW · Polperro Looe · From 48p/kWh
- [zest-type-post-user · Zest Charging](https://ampmap.co.uk/charger/zest-charging-zest-type-post-user-uk) - Type 2 7 kW · Porthallow
- [Tourist Information Centre West Looe · POGO](https://ampmap.co.uk/charger/pogo-tourist-information-centre-west-looe-uk) - CCS 50 kW, CHAdeMO 50 kW · Millpool · From 56p/kWh
- [Cornwall Council West Looe · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-cornwall-council-west-looe-uk) - CCS 50 kW, CHAdeMO 50 kW · Millpool
- [Millpool · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-millpool-uk) - Unknown 3 kW · Millpool

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/trenderway-farm-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Trenderway Farm (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
