Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

EV charging site

Trinity Street

Trinity Street, Coventry, CV1 1FJ

Trinity Street is an EV charging site in Coventry. Its 2 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and the price is listed as 29p/kWh PAYG. 66 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Salt Lane Carpark (ESB Energy), 0.2 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 18 Nov 2019Last verified 18 Nov 2019

Connectors

CCS · 50 kW2 connectors
CHAdeMO · 50 kW2 connectors
Type 2 · 43 kW2 connectors

Site information

Opening hours
Not published
Access
Public · membership required · access key required
Price
29p/kWh PAYG(from Open Charge Map, 18 Nov 2019)
Notes
ESB EV Solutions charger

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Trinity Street?

The listed price is 29p/kWh PAYG. Prices can change, so check the price at the charger before you start.

How fast is charging at Trinity Street?

Up to 50 kW DC via CCS, CHAdeMO, Type 2.

How many charging sockets does Trinity Street have?

2 charging sockets: 2 × 50 kW CCS, 2 × 50 kW CHAdeMO, 2 × 43 kW Type 2.

Where is the nearest other charger with 50 kW or more to Trinity Street?

Salt Lane Carpark (ESB Energy) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Trinity Street?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Trinity Street?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Trinity Street?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 18 Nov 2019

Amp Map does not take payment. You pay the operator.