Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Trojan Energy · EV charging site

hub_l001701_cs_08

Orange Hill Road, Finchley, HA8 0SZ

hub_l001701_cs_08 is an EV charging site in Finchley, Greater London, run by Trojan Energy. It has a single 22 kW Type 2 socket. 12 other charging sites are listed within a mile, and the nearest site with 50 kW or more is [E-TAXI ONLY] Queensbury Station Car Park (BP Pulse), 1.2 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 7 Dec 2023Last verified 7 Dec 2023

Connectors

Type 2 · 22 kW1 connector

Site information

Opening hours
Not published
Access
Public · membership required · access key required

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at hub_l001701_cs_08 (Trojan Energy)?

Up to 22 kW AC via Type 2.

How many charging sockets does hub_l001701_cs_08 (Trojan Energy) have?

1 charging socket: 1 × 22 kW Type 2.

Who operates hub_l001701_cs_08?

hub_l001701_cs_08 is on the Trojan Energy network.

Where is the nearest charger with 50 kW or more to hub_l001701_cs_08 (Trojan Energy)?

[E-TAXI ONLY] Queensbury Station Car Park (BP Pulse) is 1.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at hub_l001701_cs_08 (Trojan Energy)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at hub_l001701_cs_08 (Trojan Energy)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at hub_l001701_cs_08 (Trojan Energy)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 7 Dec 2023