# hub\_l003701\_cs\_11 · Trojan Energy

Web page: https://ampmap.co.uk/charger/trojan-energy-hub-l003701-cs-11-uk

hub\_l003701\_cs\_11 is an EV charging site in Friern Barnet, Greater London, run by Trojan Energy. It has a single 22 kW Type 2 socket.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Glenthorne Road, N11 3HL
- **Area:** Friern Barnet, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.61634, -0.15315

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 1 | Not listed |

## Site information

- **Operator:** Trojan Energy
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How fast is charging at hub\_l003701\_cs\_11 (Trojan Energy)?

Up to 22 kW AC via Type 2.

### How many charging sockets does hub\_l003701\_cs\_11 (Trojan Energy) have?

1 charging socket: 1 × 22 kW Type 2.

### Who operates hub\_l003701\_cs\_11?

hub\_l003701\_cs\_11 is on the Trojan Energy network.

### How long does a Tesla Model Y Long Range take to charge at hub\_l003701\_cs\_11 (Trojan Energy)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at hub\_l003701\_cs\_11 (Trojan Energy)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at hub\_l003701\_cs\_11 (Trojan Energy)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Friern Barnet](https://ampmap.co.uk/chargers/united-kingdom/greater-london/friern-barnet)
- [Trojan Energy chargers](https://ampmap.co.uk/networks/trojan-energy)

## Chargers near this site

- [hub\_l003701\_cs\_09 · Trojan Energy](https://ampmap.co.uk/charger/trojan-energy-hub-l003701-cs-09-uk) - Type 2 22 kW · Glenthorne Road
- [ubitricity Distributed Energy Systems UK Ltd. 8 Bellevue Road](https://ampmap.co.uk/charger/ubitricity-8-bellevue-road-uk) - Ubitricity · Type 2 5 kW · 8 Bellevue Road · From 46p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 17 St Johns Avenue](https://ampmap.co.uk/charger/ubitricity-17-st-johns-avenue-uk) - Ubitricity · Type 2 5 kW · 17 St Johns Avenue · From 46p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 159 Torrington Park, Opp.](https://ampmap.co.uk/charger/ubitricity-159-torrington-park-opp-uk) - Ubitricity · Type 2 5 kW · 159 Torrington Park, Opp. · From 46p/kWh
- [hub\_l001901\_cs\_01 · Trojan Energy](https://ampmap.co.uk/charger/trojan-energy-hub-l001901-cs-01-uk) - Type 2 22 kW · Brunswick Crescent
- [hub\_l001901\_cs\_07 · Trojan Energy](https://ampmap.co.uk/charger/trojan-energy-hub-l001901-cs-07-uk) - Type 2 22 kW · Brunswick Crescent

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/trojan-energy-hub-l003701-cs-11-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 7 Dec 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
