# ubitricity Distributed Energy Systems UK Ltd. 100 N Ormesby Road, Opp.

Web page: https://ampmap.co.uk/charger/ubitricity-100-n-ormesby-road-opp-uk

ubitricity Distributed Energy Systems UK Ltd. 100 N Ormesby Road, Opp. is an EV charging site in Middlesbrough, run by Ubitricity and open 24 hours a day. It has a single 5 kW Type 2 socket, and published prices run from £0.45 to £0.67 per kWh.

## Status

Offline at 22 Nov 2026, 16:42 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** 100 N Ormesby Road, Opp., TS4 2AH
- **Area:** Middlesbrough, United Kingdom
- **Coordinates (latitude, longitude):** 54.57287, -1.22233

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 5 kW | 1 | £0.67/kWh | Status unknown |

### Prices by time of day

| From | To | Days | Price per kWh |
| --- | --- | --- | --- |
| 16:00 | 19:59 | Every day | £0.67/kWh |
| 07:00 | 23:59 | Every day | £0.56/kWh |
| 00:00 | 06:59 | Every day | £0.45/kWh |
| 07:00 | 15:59 | MONDAY | £0.56/kWh |

Listed in the operator's order: where rows overlap, the first one that matches applies.

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** Ubitricity
- **Opening hours:** Open 24 hours
- **Payment:** In the Shell app

## Common questions

### How much does it cost to charge at ubitricity Distributed Energy Systems UK Ltd. 100 N Ormesby Road, Opp.?

The listed price is £0.45–£0.67/kWh · varies by time of day. Prices can change, so check the price at the charger before you start.

### How fast is charging at ubitricity Distributed Energy Systems UK Ltd. 100 N Ormesby Road, Opp.?

Up to 5 kW AC via Type 2.

### How many charging sockets does ubitricity Distributed Energy Systems UK Ltd. 100 N Ormesby Road, Opp. have?

1 charging socket: 1 × 5 kW Type 2. Live per-socket availability is shown on this page.

### Is ubitricity Distributed Energy Systems UK Ltd. 100 N Ormesby Road, Opp. open 24/7?

Yes - ubitricity Distributed Energy Systems UK Ltd. 100 N Ormesby Road, Opp. is open 24 hours a day, 7 days a week.

### Who operates ubitricity Distributed Energy Systems UK Ltd. 100 N Ormesby Road, Opp.?

ubitricity Distributed Energy Systems UK Ltd. 100 N Ormesby Road, Opp. is on the Ubitricity network.

### How long does a Tesla Model Y Long Range take to charge at ubitricity Distributed Energy Systems UK Ltd. 100 N Ormesby Road, Opp.?

A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh (~£37 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at ubitricity Distributed Energy Systems UK Ltd. 100 N Ormesby Road, Opp.?

A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh (~£27 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at ubitricity Distributed Energy Systems UK Ltd. 100 N Ormesby Road, Opp.?

A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Middlesbrough](https://ampmap.co.uk/chargers/united-kingdom/middlesbrough/middlesbrough)
- [Cheapest charging in Middlesbrough](https://ampmap.co.uk/chargers/united-kingdom/middlesbrough/middlesbrough/cheapest)
- [Ubitricity chargers](https://ampmap.co.uk/networks/ubitricity)

## Chargers near this site

- [Rivers House · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-rivers-house-uk) - Type 2 7 kW · Rivers House
- [ubitricity Distributed Energy Systems UK Ltd. 12 Bright St](https://ampmap.co.uk/charger/ubitricity-12-bright-st-uk) - Ubitricity · Type 2 5 kW · 12 Bright St · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 10 Bright Street](https://ampmap.co.uk/charger/ubitricity-10-bright-street-uk) - Ubitricity · Type 2 5 kW · 10 Bright Street · From 45p/kWh
- [Thirteen Housing · EO Charging](https://ampmap.co.uk/charger/eo-charging-thirteen-housing-uk) - Type 2 7 kW · 2 Hudson Quay
- [ubitricity Distributed Energy Systems UK Ltd. 66 Southfield Road](https://ampmap.co.uk/charger/ubitricity-66-southfield-road-uk) - Ubitricity · Type 2 5 kW · 66 Southfield Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 39 Angle St](https://ampmap.co.uk/charger/ubitricity-39-angle-st-uk) - Ubitricity · Type 2 5 kW · 39 Angle St · From 45p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/ubitricity-100-n-ormesby-road-opp-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Ubitricity (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
