# ubitricity Distributed Energy Systems UK Ltd. 114 Hurst Road

Web page: https://ampmap.co.uk/charger/ubitricity-114-hurst-road-uk

ubitricity Distributed Energy Systems UK Ltd. 114 Hurst Road is an EV charging site in Bexley, Greater London, run by Ubitricity and open 24 hours a day. It has a single 5 kW Type 2 socket, and published prices run from £0.45 to £0.67 per kWh. Amp Map measured 100% uptime here over the last 30 days.

## Status

1 of 1 open at 22 Nov 2026, 17:42 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** 114 Hurst Road, DA15 9AF
- **Area:** Bexley, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.43518, 0.11059

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 5 kW | 1 | £0.67/kWh | 1 free |

### Prices by time of day

| From | To | Days | Price per kWh |
| --- | --- | --- | --- |
| 16:00 | 19:59 | Every day | £0.67/kWh |
| 07:00 | 23:59 | Every day | £0.56/kWh |
| 00:00 | 06:59 | Every day | £0.45/kWh |
| 07:00 | 15:59 | MONDAY | £0.56/kWh |

Listed in the operator's order: where rows overlap, the first one that matches applies.

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** Ubitricity
- **Opening hours:** Open 24 hours
- **Payment:** In the Shell app

## Common questions

### How much does it cost to charge at ubitricity Distributed Energy Systems UK Ltd. 114 Hurst Road?

The listed price is £0.45–£0.67/kWh · varies by time of day. Prices can change, so check the price at the charger before you start.

### How fast is charging at ubitricity Distributed Energy Systems UK Ltd. 114 Hurst Road?

Up to 5 kW AC via Type 2.

### How many charging sockets does ubitricity Distributed Energy Systems UK Ltd. 114 Hurst Road have?

1 charging socket: 1 × 5 kW Type 2. Live per-socket availability is shown on this page.

### Is ubitricity Distributed Energy Systems UK Ltd. 114 Hurst Road open 24/7?

Yes - ubitricity Distributed Energy Systems UK Ltd. 114 Hurst Road is open 24 hours a day, 7 days a week.

### How reliable is ubitricity Distributed Energy Systems UK Ltd. 114 Hurst Road?

Amp Map measured 100% uptime here from recorded live status over the last 30 days.

### Who operates ubitricity Distributed Energy Systems UK Ltd. 114 Hurst Road?

ubitricity Distributed Energy Systems UK Ltd. 114 Hurst Road is on the Ubitricity network.

### How long does a Tesla Model Y Long Range take to charge at ubitricity Distributed Energy Systems UK Ltd. 114 Hurst Road?

A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh (~£37 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at ubitricity Distributed Energy Systems UK Ltd. 114 Hurst Road?

A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh (~£27 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at ubitricity Distributed Energy Systems UK Ltd. 114 Hurst Road?

A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Bexley](https://ampmap.co.uk/chargers/united-kingdom/greater-london/bexley)
- [Cheapest charging in Bexley](https://ampmap.co.uk/chargers/united-kingdom/greater-london/bexley/cheapest)
- [Ubitricity chargers](https://ampmap.co.uk/networks/ubitricity)

## Chargers near this site

- [ubitricity Distributed Energy Systems UK Ltd. 130 Hurst Road](https://ampmap.co.uk/charger/ubitricity-130-hurst-road-uk) - Ubitricity · Type 2 5 kW · 130 Hurst Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 61 Faraday Avenue, Opp.](https://ampmap.co.uk/charger/ubitricity-61-faraday-avenue-opp-uk) - Ubitricity · Type 2 5 kW · 61 Faraday Avenue, Opp. · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 50 Hurst Road](https://ampmap.co.uk/charger/ubitricity-50-hurst-road-uk) - Ubitricity · Type 2 5 kW · 50 Hurst Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 131 Walton Road](https://ampmap.co.uk/charger/ubitricity-131-walton-road-uk) - Ubitricity · Type 2 5 kW · 131 Walton Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 3 Abbeyhill Road](https://ampmap.co.uk/charger/ubitricity-3-abbeyhill-road-uk) - Ubitricity · Type 2 5 kW · 3 Abbeyhill Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 1 Blenheim Road](https://ampmap.co.uk/charger/ubitricity-1-blenheim-road-uk) - Ubitricity · Type 2 5 kW · 1 Blenheim Road · From 45p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/ubitricity-114-hurst-road-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Ubitricity (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
