Ubitricity · EV charging site
ubitricity Distributed Energy Systems UK Ltd. 17B Lakeside Road, Outside 17B
17B Lakeside Road, Outside 17B, Shepherds Bush, W14 0DX
ubitricity Distributed Energy Systems UK Ltd. 17B Lakeside Road, Outside 17B is an EV charging site in Shepherds Bush, Greater London, run by Ubitricity and open 24 hours a day. It has a single 5 kW Type 2 socket, and published prices run from £0.45 to £0.67 per kWh. Recorded live status shows it is usually busiest around 2 pm, and Amp Map measured 99% uptime and recorded 2 charging sessions here over the last 30 days. 1,386 other charging sites are listed within a mile, and the nearest site with 50 kW or more is [E-TAXI ONLY] Russell Gardens (BP Pulse), 0.3 miles away.
Status
1 of 1 available
Checking status…
Connectors
Type 2 · 5 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Ubitricity
- Opening hours
- Open 24 hours
- Payment
- In the Shell app
- Charger ID
- scit09937
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
Price times
| Rate | Hours | Price | Current |
|---|---|---|---|
| Off-peak | 00:00–07:00 | £0.45/kWh | |
| Standard | 07:00–16:00 | £0.56/kWh | |
| Peak | 16:00–20:00 | £0.67/kWh | |
| Standard | 20:00–00:00 | £0.56/kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at ubitricity Distributed Energy Systems UK Ltd. 17B Lakeside Road, Outside 17B?
The listed price is £0.45–£0.67/kWh · varies by time of day. Prices can change, so check the price at the charger before you start.
How fast is charging at ubitricity Distributed Energy Systems UK Ltd. 17B Lakeside Road, Outside 17B?
Up to 5 kW AC via Type 2.
How many charging sockets does ubitricity Distributed Energy Systems UK Ltd. 17B Lakeside Road, Outside 17B have?
1 charging socket: 1 × 5 kW Type 2. Live per-socket availability is shown on this page.
Is ubitricity Distributed Energy Systems UK Ltd. 17B Lakeside Road, Outside 17B open 24/7?
Yes - ubitricity Distributed Energy Systems UK Ltd. 17B Lakeside Road, Outside 17B is open 24 hours a day, 7 days a week.
When is ubitricity Distributed Energy Systems UK Ltd. 17B Lakeside Road, Outside 17B busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 9 am. The live status on this page shows what is free before you set off.
How reliable is ubitricity Distributed Energy Systems UK Ltd. 17B Lakeside Road, Outside 17B?
Amp Map measured 99% uptime here from recorded live status over the last 30 days, across 2 observed charging sessions.
Who operates ubitricity Distributed Energy Systems UK Ltd. 17B Lakeside Road, Outside 17B?
ubitricity Distributed Energy Systems UK Ltd. 17B Lakeside Road, Outside 17B is on the Ubitricity network.
Where is the nearest charger with 50 kW or more to ubitricity Distributed Energy Systems UK Ltd. 17B Lakeside Road, Outside 17B?
[E-TAXI ONLY] Russell Gardens (BP Pulse) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at ubitricity Distributed Energy Systems UK Ltd. 17B Lakeside Road, Outside 17B?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at ubitricity Distributed Energy Systems UK Ltd. 17B Lakeside Road, Outside 17B?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at ubitricity Distributed Energy Systems UK Ltd. 17B Lakeside Road, Outside 17B?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh (~£29 at the published price). Estimates assume a typical charge curve and a warm battery.