Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Ubitricity · EV charging site

Ubitricity 29 Parmiter Street

29 Parmiter Street, Bethnal Green, E2 9NG

Ubitricity 29 Parmiter Street is an EV charging site in Bethnal Green, Greater London, run by Ubitricity and open 24 hours a day. It has a single 5 kW Type 2 socket, and the published price is £0.39 per kWh. Recorded live status shows it is usually busiest around 6 am. 539 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Ultra Rapid EV Charging - Sainsbury's Whitechapel (Smart Charge by Sainsbury's), 0.8 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 27 May 2023Last verified 27 May 2023

Connectors

Type 2 · 5 kW1 connector · 39p per kWh

Site information

Operator
Ubitricity
Opening hours
Open 24 hours
Access
Public
Payment
In the Shell app
Phone (from Open Charge Map)
0800 086 9606
Notes
Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.
Getting there
A4 Permit Holders Only: Mon - Fri, 08:30 - 17:30 or Pay by Phone

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 25 kW39p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 5 kW Type 2~11h 4m · ≈ 55 kWh · ~£22
Tesla Model 3 Rear-Wheel Drive 10–80% · 5 kW Type 2~7h 59m · ≈ 40 kWh · ~£16
Audi Q4 e-tron 50 10–80% · 5 kW Type 2~10h 13m · ≈ 51 kWh · ~£20
Hyundai IONIQ 5 10–80% · 5 kW Type 2~10h 10m · ≈ 51 kWh · ~£20
MG Motor MG4 Trophy 10–80% · 5 kW Type 2~8h 32m · ≈ 43 kWh · ~£17
Hyundai Kona Electric Long Range 10–80% · 5 kW Type 2~8h 7m · ≈ 41 kWh · ~£16
Nissan LEAF 10–80% · 5 kW Type 2~5h 36m · ≈ 28 kWh · ~£11

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Ubitricity 29 Parmiter Street?

The listed price is £0.39/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Ubitricity 29 Parmiter Street?

Up to 5 kW AC via Type 2.

How many charging sockets does Ubitricity 29 Parmiter Street have?

1 charging socket: 1 × 5 kW Type 2.

Is Ubitricity 29 Parmiter Street open 24/7?

Yes - Ubitricity 29 Parmiter Street is open 24 hours a day, 7 days a week.

When is Ubitricity 29 Parmiter Street busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 6 am and quietest around 10 pm. The live status on this page shows what is free before you set off.

Who operates Ubitricity 29 Parmiter Street?

Ubitricity 29 Parmiter Street is on the Ubitricity network. For site issues, the operator lists 0800 086 9606.

Where is the nearest charger with 50 kW or more to Ubitricity 29 Parmiter Street?

Ultra Rapid EV Charging - Sainsbury's Whitechapel (Smart Charge by Sainsbury's) is 0.8 miles away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Ubitricity 29 Parmiter Street?

A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ubitricity 29 Parmiter Street?

A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh (~£16 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Ubitricity 29 Parmiter Street?

A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh (~£20 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 27 May 2023

Amp Map does not take payment. You pay the operator.