# ubitricity Distributed Energy Systems UK Ltd. 20 Crawford Avenue, opp. junc. Welbeck Avenue

Web page: https://ampmap.co.uk/charger/ubitricity-20-crawford-avenue-opp-junc-welbeck-avenue-uk

ubitricity Distributed Energy Systems UK Ltd. 20 Crawford Avenue, opp. junc. Welbeck Avenue is an EV charging site in Old Swan, Liverpool, run by Ubitricity and open 24 hours a day. It has a single 5 kW Type 2 socket, and published prices run from £0.45 to £0.67 per kWh. Recorded live status shows it is usually busiest around 11 pm, and Amp Map measured 100% uptime and recorded 18 charging sessions here over the last 30 days.

## Status

Full at 23 Nov 2026, 02:15 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** 20 Crawford Avenue, opp. junc. Welbeck Avenue, L18 1DR
- **Area:** Old Swan, Liverpool, United Kingdom
- **Coordinates (latitude, longitude):** 53.38900, -2.92171

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 5 kW | 1 | £0.45/kWh | 1 in use |

### Prices by time of day

| From | To | Days | Price per kWh |
| --- | --- | --- | --- |
| 16:00 | 19:59 | Every day | £0.67/kWh |
| 07:00 | 23:59 | Every day | £0.56/kWh |
| 00:00 | 06:59 | Every day | £0.45/kWh |
| 07:00 | 15:59 | MONDAY | £0.56/kWh |

Listed in the operator's order: where rows overlap, the first one that matches applies.

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** Ubitricity
- **Opening hours:** Open 24 hours
- **Payment:** In the Shell app

## Common questions

### How much does it cost to charge at ubitricity Distributed Energy Systems UK Ltd. 20 Crawford Avenue, opp. junc. Welbeck Avenue?

The listed price is £0.45–£0.67/kWh · varies by time of day. Prices can change, so check the price at the charger before you start.

### How fast is charging at ubitricity Distributed Energy Systems UK Ltd. 20 Crawford Avenue, opp. junc. Welbeck Avenue?

Up to 5 kW AC via Type 2.

### How many charging sockets does ubitricity Distributed Energy Systems UK Ltd. 20 Crawford Avenue, opp. junc. Welbeck Avenue have?

1 charging socket: 1 × 5 kW Type 2. Live per-socket availability is shown on this page.

### Is ubitricity Distributed Energy Systems UK Ltd. 20 Crawford Avenue, opp. junc. Welbeck Avenue open 24/7?

Yes - ubitricity Distributed Energy Systems UK Ltd. 20 Crawford Avenue, opp. junc. Welbeck Avenue is open 24 hours a day, 7 days a week.

### When is ubitricity Distributed Energy Systems UK Ltd. 20 Crawford Avenue, opp. junc. Welbeck Avenue busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 pm and quietest around 11 am. The live status on this page shows what is free before you set off.

### How reliable is ubitricity Distributed Energy Systems UK Ltd. 20 Crawford Avenue, opp. junc. Welbeck Avenue?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 18 observed charging sessions.

### Who operates ubitricity Distributed Energy Systems UK Ltd. 20 Crawford Avenue, opp. junc. Welbeck Avenue?

ubitricity Distributed Energy Systems UK Ltd. 20 Crawford Avenue, opp. junc. Welbeck Avenue is on the Ubitricity network.

### How long does a Tesla Model Y Long Range take to charge at ubitricity Distributed Energy Systems UK Ltd. 20 Crawford Avenue, opp. junc. Welbeck Avenue?

A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh (~£25 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at ubitricity Distributed Energy Systems UK Ltd. 20 Crawford Avenue, opp. junc. Welbeck Avenue?

A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh (~£18 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at ubitricity Distributed Energy Systems UK Ltd. 20 Crawford Avenue, opp. junc. Welbeck Avenue?

A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh (~£23 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Old Swan](https://ampmap.co.uk/chargers/united-kingdom/liverpool/old-swan)
- [Cheapest charging in Old Swan](https://ampmap.co.uk/chargers/united-kingdom/liverpool/old-swan/cheapest)
- [Ubitricity chargers](https://ampmap.co.uk/networks/ubitricity)

## Chargers near this site

- [ubitricity Distributed Energy Systems UK Ltd. 11 Ramilies Road](https://ampmap.co.uk/charger/ubitricity-11-ramilies-road-uk) - Ubitricity · Type 2 5 kW · 11 Ramilies Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 4 Dudley Road, opp.](https://ampmap.co.uk/charger/ubitricity-4-dudley-road-opp-uk) - Ubitricity · Type 2 5 kW · 4 Dudley Road, opp. · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 21 Alverstone Road](https://ampmap.co.uk/charger/ubitricity-21-alverstone-road-uk) - Ubitricity · Type 2 5 kW · 21 Alverstone Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 46 Nicander Road](https://ampmap.co.uk/charger/ubitricity-46-nicander-road-uk) - Ubitricity · Type 2 5 kW · 46 Nicander Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 25 Ramilies Road](https://ampmap.co.uk/charger/ubitricity-25-ramilies-road-uk) - Ubitricity · Type 2 5 kW · 25 Ramilies Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 83 Crawford Avenue](https://ampmap.co.uk/charger/ubitricity-83-crawford-avenue-uk) - Ubitricity · Type 2 5 kW · 83 Crawford Avenue · From 45p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/ubitricity-20-crawford-avenue-opp-junc-welbeck-avenue-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Ubitricity (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
