Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Ubitricity · EV charging site

ubitricity Distributed Energy Systems UK Ltd. 43 Mason Road

43 Mason Road, Washwood Heath, B24 9EH

ubitricity Distributed Energy Systems UK Ltd. 43 Mason Road is an EV charging site in Washwood Heath, City and Borough of Birmingham, run by Ubitricity and open 24 hours a day. It has a single 5 kW Type 2 socket, and published prices run from £0.45 to £0.67 per kWh. Amp Map measured 12% uptime here over the last 30 days. 36 other charging sites are listed within a mile, and the nearest site with 50 kW or more is HU - Fort (GRIDSERVE), 1.3 miles away.

Status

Out of service

Checking status…

VerifiedLive status and details from Ubitricity’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

Type 2 · 5 kW1 connector · 56p per kWhOut of service
suby110001696612% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Ubitricity
Opening hours
Open 24 hours
Payment
In the Shell app
Charger ID
suby1100016966

Always check directly with the charge point operator for the most up-to-date information.

Prices

Price times

RateHoursPriceCurrent
Off-peak00:00–07:00£0.45/kWh
Standard07:00–16:00£0.56/kWh
Peak16:00–20:00£0.67/kWh
Standard20:00–00:00£0.56/kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 5 kW Type 2~11h 4m · ≈ 55 kWh · ~£31
Tesla Model 3 Rear-Wheel Drive 10–80% · 5 kW Type 2~7h 59m · ≈ 40 kWh · ~£22
Audi Q4 e-tron 50 10–80% · 5 kW Type 2~10h 13m · ≈ 51 kWh · ~£29
Hyundai IONIQ 5 10–80% · 5 kW Type 2~10h 10m · ≈ 51 kWh · ~£28
MG Motor MG4 Trophy 10–80% · 5 kW Type 2~8h 32m · ≈ 43 kWh · ~£24
Hyundai Kona Electric Long Range 10–80% · 5 kW Type 2~8h 7m · ≈ 41 kWh · ~£23
Nissan LEAF 10–80% · 5 kW Type 2~5h 36m · ≈ 28 kWh · ~£16

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at ubitricity Distributed Energy Systems UK Ltd. 43 Mason Road?

The listed price is £0.45–£0.67/kWh · varies by time of day. Prices can change, so check the price at the charger before you start.

How fast is charging at ubitricity Distributed Energy Systems UK Ltd. 43 Mason Road?

Up to 5 kW AC via Type 2.

How many charging sockets does ubitricity Distributed Energy Systems UK Ltd. 43 Mason Road have?

1 charging socket: 1 × 5 kW Type 2. Live per-socket availability is shown on this page.

Is ubitricity Distributed Energy Systems UK Ltd. 43 Mason Road open 24/7?

Yes - ubitricity Distributed Energy Systems UK Ltd. 43 Mason Road is open 24 hours a day, 7 days a week.

How reliable is ubitricity Distributed Energy Systems UK Ltd. 43 Mason Road?

Amp Map measured 12% uptime here from recorded live status over the last 30 days.

Who operates ubitricity Distributed Energy Systems UK Ltd. 43 Mason Road?

ubitricity Distributed Energy Systems UK Ltd. 43 Mason Road is on the Ubitricity network.

Where is the nearest charger with 50 kW or more to ubitricity Distributed Energy Systems UK Ltd. 43 Mason Road?

HU - Fort (GRIDSERVE) is 1.3 miles away in a straight line, with up to 180 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at ubitricity Distributed Energy Systems UK Ltd. 43 Mason Road?

A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at ubitricity Distributed Energy Systems UK Ltd. 43 Mason Road?

A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at ubitricity Distributed Energy Systems UK Ltd. 43 Mason Road?

A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh (~£29 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Ubitricity · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.