Ubitricity · EV charging site
ubitricity Distributed Energy Systems UK Ltd. 637 Beaumont Square, Panama House
637 Beaumont Square, Panama House, Stepney, E1 4NA
ubitricity Distributed Energy Systems UK Ltd. 637 Beaumont Square, Panama House is an EV charging site in Stepney, Greater London (E1 4NA), run by Ubitricity and open 24 hours a day. All 3 of its sockets are 5 kW Type 2, and published prices run from £0.39 to £0.55 per kWh. Recorded live status shows it is usually busiest around 6 am, and Amp Map measured 100% uptime and recorded 38 charging sessions here over the last 30 days. Amp Map lists 1 other charge point named ubitricity Distributed Energy Systems UK Ltd. 637 Beaumont Square, Panama House in Stepney. 864 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Ultra Rapid EV Charging - Sainsbury's Whitechapel (Smart Charge by Sainsbury's), 0.6 miles away.
Status
2 of 3 available
Checking status…
Connectors
Type 2 · 5 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Ubitricity
- Opening hours
- Open 24 hours
- Payment
- In the Shell app
- Charger ID
- suby1100017170
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
Price times
| Rate | Hours | Price | Current |
|---|---|---|---|
| Off-peak | 00:00–07:00 | £0.39/kWh | |
| Peak | 07:00–00:00 | £0.55/kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at ubitricity Distributed Energy Systems UK Ltd. 637 Beaumont Square, Panama House?
The listed price is £0.39–£0.55/kWh · varies by time of day. Prices can change, so check the price at the charger before you start.
How fast is charging at ubitricity Distributed Energy Systems UK Ltd. 637 Beaumont Square, Panama House?
Up to 5 kW AC via Type 2.
How many charging sockets does ubitricity Distributed Energy Systems UK Ltd. 637 Beaumont Square, Panama House have?
3 charging sockets: 3 × 5 kW Type 2. Live per-socket availability is shown on this page.
Is ubitricity Distributed Energy Systems UK Ltd. 637 Beaumont Square, Panama House open 24/7?
Yes - ubitricity Distributed Energy Systems UK Ltd. 637 Beaumont Square, Panama House is open 24 hours a day, 7 days a week.
When is ubitricity Distributed Energy Systems UK Ltd. 637 Beaumont Square, Panama House busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 6 am and quietest around 4 pm. The live status on this page shows what is free before you set off.
How reliable is ubitricity Distributed Energy Systems UK Ltd. 637 Beaumont Square, Panama House?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 38 observed charging sessions.
Who operates ubitricity Distributed Energy Systems UK Ltd. 637 Beaumont Square, Panama House?
ubitricity Distributed Energy Systems UK Ltd. 637 Beaumont Square, Panama House is on the Ubitricity network.
Where is the nearest charger with 50 kW or more to ubitricity Distributed Energy Systems UK Ltd. 637 Beaumont Square, Panama House?
Ultra Rapid EV Charging - Sainsbury's Whitechapel (Smart Charge by Sainsbury's) is 0.6 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at ubitricity Distributed Energy Systems UK Ltd. 637 Beaumont Square, Panama House?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh (~£30 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at ubitricity Distributed Energy Systems UK Ltd. 637 Beaumont Square, Panama House?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at ubitricity Distributed Energy Systems UK Ltd. 637 Beaumont Square, Panama House?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh (~£28 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 637 Beaumont Square, Panama House
- ubitricity Distributed Energy Systems UK Ltd. Beaumont Square, Beaumont Court Care Home
- ubitricity Distributed Energy Systems UK Ltd. Beaumont Square, Side of 60 Morecambe Close
- ubitricity Distributed Energy Systems UK Ltd. 93 White Horse Road
- ubitricity Distributed Energy Systems UK Ltd. Beaumont Square, Junc. Eastbury Terrace
- ubitricity Distributed Energy Systems UK Ltd. 27 White Horse Road