# ubitricity Distributed Energy Systems UK Ltd. Low Wood Road, Junc. Marsh Lane

Web page: https://ampmap.co.uk/charger/ubitricity-low-wood-road-junc-marsh-lane-uk

ubitricity Distributed Energy Systems UK Ltd. Low Wood Road, Junc. Marsh Lane is an EV charging site in Washwood Heath, City and Borough of Birmingham, run by Ubitricity and open 24 hours a day. It has a single 5 kW Type 2 socket, and published prices run from £0.45 to £0.67 per kWh. Amp Map measured 100% uptime here over the last 30 days.

## Status

1 of 1 open at 23 Nov 2026, 00:21 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Low Wood Road, Junc. Marsh Lane, B23 6HT
- **Area:** Washwood Heath, City and Borough of Birmingham, United Kingdom
- **Coordinates (latitude, longitude):** 52.52690, -1.85439

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 5 kW | 1 | £0.45/kWh | 1 free |

### Prices by time of day

| From | To | Days | Price per kWh |
| --- | --- | --- | --- |
| 16:00 | 19:59 | Every day | £0.67/kWh |
| 07:00 | 23:59 | Every day | £0.56/kWh |
| 00:00 | 06:59 | Every day | £0.45/kWh |
| 07:00 | 15:59 | MONDAY | £0.56/kWh |

Listed in the operator's order: where rows overlap, the first one that matches applies.

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** Ubitricity
- **Opening hours:** Open 24 hours
- **Payment:** In the Shell app

## Common questions

### How much does it cost to charge at ubitricity Distributed Energy Systems UK Ltd. Low Wood Road, Junc. Marsh Lane?

The listed price is £0.45–£0.67/kWh · varies by time of day. Prices can change, so check the price at the charger before you start.

### How fast is charging at ubitricity Distributed Energy Systems UK Ltd. Low Wood Road, Junc. Marsh Lane?

Up to 5 kW AC via Type 2.

### How many charging sockets does ubitricity Distributed Energy Systems UK Ltd. Low Wood Road, Junc. Marsh Lane have?

1 charging socket: 1 × 5 kW Type 2. Live per-socket availability is shown on this page.

### Is ubitricity Distributed Energy Systems UK Ltd. Low Wood Road, Junc. Marsh Lane open 24/7?

Yes - ubitricity Distributed Energy Systems UK Ltd. Low Wood Road, Junc. Marsh Lane is open 24 hours a day, 7 days a week.

### How reliable is ubitricity Distributed Energy Systems UK Ltd. Low Wood Road, Junc. Marsh Lane?

Amp Map measured 100% uptime here from recorded live status over the last 30 days.

### Who operates ubitricity Distributed Energy Systems UK Ltd. Low Wood Road, Junc. Marsh Lane?

ubitricity Distributed Energy Systems UK Ltd. Low Wood Road, Junc. Marsh Lane is on the Ubitricity network.

### How long does a Tesla Model Y Long Range take to charge at ubitricity Distributed Energy Systems UK Ltd. Low Wood Road, Junc. Marsh Lane?

A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh (~£25 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at ubitricity Distributed Energy Systems UK Ltd. Low Wood Road, Junc. Marsh Lane?

A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh (~£18 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at ubitricity Distributed Energy Systems UK Ltd. Low Wood Road, Junc. Marsh Lane?

A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh (~£23 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Washwood Heath](https://ampmap.co.uk/chargers/united-kingdom/city-and-borough-of-birmingham/washwood-heath)
- [Cheapest charging in Washwood Heath](https://ampmap.co.uk/chargers/united-kingdom/city-and-borough-of-birmingham/washwood-heath/cheapest)
- [Ubitricity chargers](https://ampmap.co.uk/networks/ubitricity)

## Chargers near this site

- [ubitricity Distributed Energy Systems UK Ltd. 5 Low Wood Road](https://ampmap.co.uk/charger/ubitricity-5-low-wood-road-uk) - Ubitricity · Type 2 5 kW · 5 Low Wood Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 10 Chudleigh Road](https://ampmap.co.uk/charger/ubitricity-10-chudleigh-road-uk) - Ubitricity · Type 2 5 kW · 10 Chudleigh Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 44 Low Wood Road](https://ampmap.co.uk/charger/ubitricity-44-low-wood-road-uk) - Ubitricity · Type 2 5 kW · 44 Low Wood Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. Chudleigh Road, Junc. Low Wood Road](https://ampmap.co.uk/charger/ubitricity-chudleigh-road-junc-low-wood-road-uk) - Ubitricity · Type 2 5 kW · Chudleigh Road, Junc. Low Wood Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 43 Chudleigh Road](https://ampmap.co.uk/charger/ubitricity-43-chudleigh-road-uk) - Ubitricity · Type 2 5 kW · 43 Chudleigh Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 74 Chudleigh Road](https://ampmap.co.uk/charger/ubitricity-74-chudleigh-road-uk) - Ubitricity · Type 2 5 kW · 74 Chudleigh Road · From 45p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/ubitricity-low-wood-road-junc-marsh-lane-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Ubitricity (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
