# ubitricity Distributed Energy Systems UK Ltd. opp Albermarle Primary, Albert Drive

Web page: https://ampmap.co.uk/charger/ubitricity-opp-albermarle-primary-albert-drive-uk

ubitricity Distributed Energy Systems UK Ltd. opp Albermarle Primary, Albert Drive is an EV charging site in Earlsfield, Greater London, run by Ubitricity and open 24 hours a day. It has a single 5 kW Type 2 socket, and published prices run from £0.44 to £0.67 per kWh. Recorded live status shows it is usually busiest around 10 pm, and Amp Map measured 100% uptime and recorded 35 charging sessions here over the last 30 days.

## Status

Full at 22 Nov 2026, 21:03 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** opp Albermarle Primary, Albert Drive, SW19 6JP
- **Area:** Earlsfield, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.44233, -0.21251

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 5 kW | 1 | £0.56/kWh | 1 in use |

### Prices by time of day

| From | To | Days | Price per kWh |
| --- | --- | --- | --- |
| 16:00 | 19:59 | Every day | £0.67/kWh |
| 07:00 | 23:59 | Every day | £0.56/kWh |
| 00:00 | 06:59 | Every day | £0.45/kWh |
| 00:00 | 23:59 | Every day | £0.44/kWh |
| 07:00 | 15:59 | MONDAY | £0.56/kWh |

Listed in the operator's order: where rows overlap, the first one that matches applies.

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** Ubitricity
- **Opening hours:** Open 24 hours
- **Payment:** In the Shell app

## Common questions

### How much does it cost to charge at ubitricity Distributed Energy Systems UK Ltd. opp Albermarle Primary, Albert Drive?

The listed price is £0.44–£0.67/kWh · varies by time of day. Prices can change, so check the price at the charger before you start.

### How fast is charging at ubitricity Distributed Energy Systems UK Ltd. opp Albermarle Primary, Albert Drive?

Up to 5 kW AC via Type 2.

### How many charging sockets does ubitricity Distributed Energy Systems UK Ltd. opp Albermarle Primary, Albert Drive have?

1 charging socket: 1 × 5 kW Type 2. Live per-socket availability is shown on this page.

### Is ubitricity Distributed Energy Systems UK Ltd. opp Albermarle Primary, Albert Drive open 24/7?

Yes - ubitricity Distributed Energy Systems UK Ltd. opp Albermarle Primary, Albert Drive is open 24 hours a day, 7 days a week.

### When is ubitricity Distributed Energy Systems UK Ltd. opp Albermarle Primary, Albert Drive busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 10 pm and quietest around 10 am. The live status on this page shows what is free before you set off.

### How reliable is ubitricity Distributed Energy Systems UK Ltd. opp Albermarle Primary, Albert Drive?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 35 observed charging sessions.

### Who operates ubitricity Distributed Energy Systems UK Ltd. opp Albermarle Primary, Albert Drive?

ubitricity Distributed Energy Systems UK Ltd. opp Albermarle Primary, Albert Drive is on the Ubitricity network.

### How long does a Tesla Model Y Long Range take to charge at ubitricity Distributed Energy Systems UK Ltd. opp Albermarle Primary, Albert Drive?

A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at ubitricity Distributed Energy Systems UK Ltd. opp Albermarle Primary, Albert Drive?

A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at ubitricity Distributed Energy Systems UK Ltd. opp Albermarle Primary, Albert Drive?

A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh (~£29 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Earlsfield](https://ampmap.co.uk/chargers/united-kingdom/greater-london/earlsfield)
- [Cheapest charging in Earlsfield](https://ampmap.co.uk/chargers/united-kingdom/greater-london/earlsfield/cheapest)
- [Ubitricity chargers](https://ampmap.co.uk/networks/ubitricity)

## Chargers near this site

- [ubitricity Distributed Energy Systems UK Ltd. 67 Princes Way, Junc. Woodspring Road](https://ampmap.co.uk/charger/ubitricity-67-princes-way-junc-woodspring-road-uk) - Ubitricity · Type 2 5 kW · 67 Princes Way, Junc. Woodspring Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. Hertford Lodge, Albert Drive](https://ampmap.co.uk/charger/ubitricity-hertford-lodge-albert-drive-uk) - Ubitricity · Type 2 5 kW · Hertford Lodge, Albert Drive · From 44p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 88 Princes Way](https://ampmap.co.uk/charger/ubitricity-88-princes-way-uk) - Ubitricity · Type 2 5 kW · 88 Princes Way · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 80 Augustus Road](https://ampmap.co.uk/charger/ubitricity-80-augustus-road-uk) - Ubitricity · Type 2 5 kW · 80 Augustus Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 94 Smithwood Close, Opp.](https://ampmap.co.uk/charger/ubitricity-94-smithwood-close-opp-uk) - Ubitricity · Type 2 5 kW · 94 Smithwood Close, Opp. · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 100 - 105 Smithwood Close, Junc. Victoria Dri](https://ampmap.co.uk/charger/ubitricity-100-105-smithwood-close-junc-victoria-dri-uk) - Ubitricity · Type 2 5 kW · 100 - 105 Smithwood Close, Junc. Victoria Dri · From 45p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/ubitricity-opp-albermarle-primary-albert-drive-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Ubitricity (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
