# ubitricity Distributed Energy Systems UK Ltd. Thorngate road Side of 56 Marylands Road, sid

Web page: https://ampmap.co.uk/charger/ubitricity-thorngate-road-side-of-56-marylands-road-sid-uk

ubitricity Distributed Energy Systems UK Ltd. Thorngate road Side of 56 Marylands Road, sid is an EV charging site in Bayswater, Greater London, run by Ubitricity and open 24 hours a day. It has a single 5 kW Type 2 socket, and published prices run from £0.45 to £0.67 per kWh. Recorded live status shows it is usually busiest around 6 am, and Amp Map measured 100% uptime and recorded 5 charging sessions here over the last 30 days.

## Status

1 of 1 open at 23 Nov 2026, 01:12 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Thorngate road Side of 56 Marylands Road, sid, W9 2DR
- **Area:** Bayswater, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.52516, -0.19237

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 5 kW | 1 | £0.45/kWh | 1 free |

### Prices by time of day

| From | To | Days | Price per kWh |
| --- | --- | --- | --- |
| 16:00 | 19:59 | Every day | £0.67/kWh |
| 07:00 | 23:59 | Every day | £0.56/kWh |
| 00:00 | 06:59 | Every day | £0.45/kWh |
| 07:00 | 15:59 | MONDAY | £0.56/kWh |

Listed in the operator's order: where rows overlap, the first one that matches applies.

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** Ubitricity
- **Opening hours:** Open 24 hours
- **Payment:** In the Shell app

## Common questions

### How much does it cost to charge at ubitricity Distributed Energy Systems UK Ltd. Thorngate road Side of 56 Marylands Road, sid?

The listed price is £0.45–£0.67/kWh · varies by time of day. Prices can change, so check the price at the charger before you start.

### How fast is charging at ubitricity Distributed Energy Systems UK Ltd. Thorngate road Side of 56 Marylands Road, sid?

Up to 5 kW AC via Type 2.

### How many charging sockets does ubitricity Distributed Energy Systems UK Ltd. Thorngate road Side of 56 Marylands Road, sid have?

1 charging socket: 1 × 5 kW Type 2. Live per-socket availability is shown on this page.

### Is ubitricity Distributed Energy Systems UK Ltd. Thorngate road Side of 56 Marylands Road, sid open 24/7?

Yes - ubitricity Distributed Energy Systems UK Ltd. Thorngate road Side of 56 Marylands Road, sid is open 24 hours a day, 7 days a week.

### When is ubitricity Distributed Energy Systems UK Ltd. Thorngate road Side of 56 Marylands Road, sid busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 6 am and quietest around 4 pm. The live status on this page shows what is free before you set off.

### How reliable is ubitricity Distributed Energy Systems UK Ltd. Thorngate road Side of 56 Marylands Road, sid?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 5 observed charging sessions.

### Who operates ubitricity Distributed Energy Systems UK Ltd. Thorngate road Side of 56 Marylands Road, sid?

ubitricity Distributed Energy Systems UK Ltd. Thorngate road Side of 56 Marylands Road, sid is on the Ubitricity network.

### How long does a Tesla Model Y Long Range take to charge at ubitricity Distributed Energy Systems UK Ltd. Thorngate road Side of 56 Marylands Road, sid?

A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh (~£25 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at ubitricity Distributed Energy Systems UK Ltd. Thorngate road Side of 56 Marylands Road, sid?

A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh (~£18 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at ubitricity Distributed Energy Systems UK Ltd. Thorngate road Side of 56 Marylands Road, sid?

A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh (~£23 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Bayswater](https://ampmap.co.uk/chargers/united-kingdom/greater-london/bayswater)
- [Cheapest charging in Bayswater](https://ampmap.co.uk/chargers/united-kingdom/greater-london/bayswater/cheapest)
- [Ubitricity chargers](https://ampmap.co.uk/networks/ubitricity)

## Chargers near this site

- [ubitricity Distributed Energy Systems UK Ltd. 1 Thorngate Road](https://ampmap.co.uk/charger/ubitricity-1-thorngate-road-uk) - Ubitricity · Type 2 5 kW · 1 Thorngate Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 18 Sevington Street, junc. Marylands Road](https://ampmap.co.uk/charger/ubitricity-18-sevington-street-junc-marylands-road-2-uk) - Ubitricity · Type 2 5 kW · 18 Sevington Street, junc. Marylands Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 66 Marylands Road](https://ampmap.co.uk/charger/ubitricity-66-marylands-road-uk) - Ubitricity · Type 2 5 kW · 66 Marylands Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 103 Shirland Road, Opp.](https://ampmap.co.uk/charger/ubitricity-103-shirland-road-opp-uk) - Ubitricity · Type 2 5 kW · 103 Shirland Road, Opp. · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. Shirland Road opposite 86](https://ampmap.co.uk/charger/ubitricity-shirland-road-opposite-86-uk) - Ubitricity · Type 2 5 kW · Shirland Road opposite 86 · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 87 Shirland Road, Opp.](https://ampmap.co.uk/charger/ubitricity-87-shirland-road-opp-uk) - Ubitricity · Type 2 5 kW · 87 Shirland Road, Opp. · From 45p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/ubitricity-thorngate-road-side-of-56-marylands-road-sid-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Ubitricity (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
