EV charging site
Ulster University Magee Campus
Northland Road, Derry, BT48 7NH
Ulster University Magee Campus is an EV charging site at Northland Road in Derry, Derry City and Strabane. Both of its sockets are 22 kW Type 2, and the price is listed as £0.50 + £0.12/kWh. Amp Map lists 1 other charge point named Ulster University Magee Campus in Derry. 10 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Maxol Glendermot Rd (ESB Ecars), 1.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Public
- Price
- £0.50 + £0.12/kWh(from Open Charge Map, 30 Sept 2024)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Ulster University Magee Campus?
The listed price is £0.50 + £0.12/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Ulster University Magee Campus?
Up to 22 kW AC via Type 2.
How many charging sockets does Ulster University Magee Campus have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Where is the nearest charger with 50 kW or more to Ulster University Magee Campus?
Maxol Glendermot Rd (ESB Ecars) is 1.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Ulster University Magee Campus?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ulster University Magee Campus?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Ulster University Magee Campus?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.