Vend Electric · EV charging site
ASE Plumbing & Heating Supplies Ltd
Lingen Road, Loughton, SY8 1XD
ASE Plumbing & Heating Supplies Ltd is an EV charging site in Loughton, Shropshire, run by Vend Electric. Both of its sockets are 22 kW Type 2, and the price is listed as £0.25/kWh. 4 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Ludlow, UK (Tesla), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Vend Electric
- Opening hours
- Not published
- Access
- Public
- Price
- £0.25/kWh(from Open Charge Map, 19 Sept 2021)
- Phone (from Open Charge Map)
- 01584 873861
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at ASE Plumbing & Heating Supplies Ltd (Vend Electric)?
The listed price is £0.25/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at ASE Plumbing & Heating Supplies Ltd (Vend Electric)?
Up to 22 kW AC via Type 2.
How many charging sockets does ASE Plumbing & Heating Supplies Ltd (Vend Electric) have?
2 charging sockets: 2 × 22 kW Type 2.
Who operates ASE Plumbing & Heating Supplies Ltd?
ASE Plumbing & Heating Supplies Ltd is on the Vend Electric network. For site issues, the operator lists 01584 873861.
Where is the nearest charger with 50 kW or more to ASE Plumbing & Heating Supplies Ltd (Vend Electric)?
Ludlow, UK (Tesla) is 0.4 miles away in a straight line, with up to 250 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at ASE Plumbing & Heating Supplies Ltd (Vend Electric)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at ASE Plumbing & Heating Supplies Ltd (Vend Electric)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at ASE Plumbing & Heating Supplies Ltd (Vend Electric)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Ludlow, UK
- Squirrel, Ludlow
- Ultra Rapid EV Charging - Sainsbury's Ludlow
- Galdeford Carpark
- Mill Street Ludlow 1
- Ludlow Kitchen, Bromfield
- Cheapest nearby
- Ludlow, UK · 29p per kWh · 250 kW · 0.4 mi
- Fastest nearby
- Ludlow, UK · 250 kW · 0.4 mi