Vend Electric · EV charging site
Disley Community Centre Car Park
Buxton Old Road, New Mills, SK12 2BB
Disley Community Centre Car Park is an EV charging site in New Mills, Derbyshire, run by Vend Electric. Both of its sockets are 22 kW Type 2. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Chadwick Street Car Park (Be.EV), 2.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Vend Electric
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Getting there
- Chargepoint down access road to car park.
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Disley Community Centre Car Park (Vend Electric)?
Up to 22 kW AC via Type 2.
How many charging sockets does Disley Community Centre Car Park (Vend Electric) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Disley Community Centre Car Park?
Disley Community Centre Car Park is on the Vend Electric network.
Where is the nearest charger with 50 kW or more to Disley Community Centre Car Park (Vend Electric)?
Chadwick Street Car Park (Be.EV) is 2.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Disley Community Centre Car Park (Vend Electric)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Disley Community Centre Car Park (Vend Electric)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Disley Community Centre Car Park (Vend Electric)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Furness Vale Marina Limited
- Chadwick Street Car Park
- Pod Point Tesco Superstore - High Peak Whaley Bridge
- Canal Street Carpark
- Hazel Grove Park and Ride
- Bulls Head (Hazel Grove)
- Cheapest nearby
- Pod Point Furness Vale Marina Limited · 25.2p per kWh · 7 kW · 2.1 mi
- Fastest nearby
- Bulls Head (Hazel Grove) · 75 kW · 3.4 mi